Project details
| Status | Initial checks |
|---|---|
| Status since | 15 Oct 2026 |
| Application filed | 2 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Deepak Kumar |
| Land area | 2.6 acres (1.1 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Belon |
| Taluk / tehsil | Debai |
| District | Bulandshahr |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03918 |
In context
8 applications in Bulandshahr since January 2022 are in the same category (Mining): 4 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
No other mining lease on record has applied within 5 km of this site.
Where it is
Belon, Debai, Bulandshahr, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand (Category-I) Mining" from Riverbed of Ganga River — environmental approval granted, 9.4 km away
- "Ordinary Sand (Category-I) Mining" from Riverbed of Ganga River — cleared for impact study, 9.4 km away
- "Ordinary Sand (Category-I) Mining" from Riverbed of Ganga River — lapsed, 9.4 km away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — in-principle approval, conditions pending, 12 km away
- Proposed Project of riverbed Ordinary Sand Mining project located on Ganga… — initial checks, 13 km away
- Proposed Project of riverbed Ordinary Sand Mining project located on Ganga… — under environmental review, 13 km away
- Sand Mining at Ganga Riverbed, — environmental approval granted, 13.6 km away
- Proposed Reserved Forest Land to Be Diverted for Construction of… — initial checks, 25.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.