What is Developing? Open the mapMap

Cleared for impact studyMining · Sonbhadra, Uttar Pradesh

Proposed Gitty/Boulder (Dolostone) Mining at Araji No. 781ख, 783ग, 783घ, 787ग, 787ख, 692, 784, (Leased Area- 5.1460 Ha.) Village: Karamghatti, Tehsil: Dudhi, District: Sonbhadra, Uttar Pradesh. M/s Khaki Baba Construction Prop – Shri Ramesh Singh,(Leased Area- 5.1460 Ha.)

Proposed Gitty/Boulder (Dolostone) Mining at Araji No. 781ख, 783ग, 783घ, 787ग, 787ख, 692, 784, (Leased Area- 5.1460 Ha.) Village: Karamghatti, Tehsil: Dudhi, District: Sonbhadra, Uttar Pradesh. M/s Khaki Baba Construction Prop – Shri Ramesh Singh,(Leased Area- 5.1460 Ha.) is a proposed mining project in Karam Ghati, Dudhi, Sonbhadra, Uttar Pradesh. The site covers 12.7 acres. Its stated project cost is ₹99 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 28 May 2025).

See it on the live map All projects in Sonbhadra

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Gitty/Boulder (Dolostone) Mining at Araji No. 781ख, 783ग, 783घ, 787ग, 787ख,…

Project details

StatusCleared for impact study
Status since28 May 2025
Application filed9 Apr 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRamesh Singh
Land area12.7 acres (5.2 ha)
Project cost₹99 lakh
Village / localityKaram Ghati
Taluk / tehsilDudhi
DistrictSonbhadra
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03651

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Oct 2025Environmental approval granted12.7 acres₹99 lakh
Early planning filed 9 Apr 2025 (this page)Cleared for impact study12.7 acres₹99 lakh

In context

209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12.7 acres, this one is larger than 81% of them.

No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.

Where it is

Karam Ghati, Dudhi, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ramesh Singh in Sonbhadra

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.