Quick answers
What is this project?
Riverbed Ordinary Sand/Morrrum Mining at Gata No. 200, Village- Dighari, Tehsil- Karvi, District- Chitrakoot, Uttar Pradesh is a lapsed mining project in Mamsi Khurd, Baberu, Banda, Uttar Pradesh. The site covers 5.1 acres.
Who is building it?
The applicant is Chandrashekhar Dwivedi.
Has it been approved?
No. The application was lapsed on 14 Jun 2025, so it is no longer under consideration.
Where is it?
In Mamsi Khurd, Baberu, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹80 lakh and a site of 5.1 acres.
When was it filed?
The application was filed on 13 May 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Jun 2025 |
| Application filed | 13 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Chandrashekhar Dwivedi |
| Land area | 5.1 acres (2.1 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Mamsi Khurd |
| Taluk / tehsil | Baberu |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02934 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5.1 acres, this one is smaller than 85% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Mamsi Khurd, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mine from Riverbed of Baghein River — environmental approval granted, 3.5 km away
- Sand/Morrum Mine from Riverbed of Baghein River — cleared for impact study, 3.5 km away
- Sand/Morrum mining from Riverbed of Baghain River, at Khasra/Gata No. 21 Ka,… — environmental approval granted, 11.4 km away
- "Riverbed Sand/Morrum" Mining from Riverbed of Baghein River from Village-… — environmental approval granted, 16.4 km away
- "Riverbed Sand/Morrum" Mining from Riverbed of Baghein River from Village-… — cleared for impact study, 16.4 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — initial checks, 23.1 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review, 23.1 km away
- "Sand/Morrum Mining" from Riverbed of Baghain River — lapsed, 24 km away
More from Chandrashekhar Dwivedi in Banda
- Riverbed Sand/Morrum Mining having lease area-9.340 ha along River Bagen in… — environmental approval granted
- Riverbed Sand/Morrum Mining having lease area-9.340 ha along River Bagen in… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.