What is Developing? Open the mapMap

Environmental approval grantedMining · Banda, Uttar Pradesh

Sand/Morrum mining from Riverbed of Baghain River, at Khasra/Gata No. 21 Ka, Lease Area-1.1380 ha

Sand/Morrum mining from Riverbed of Baghain River, at Khasra/Gata No. 21 Ka, Lease Area-1.1380 ha is an approved mining project in Oihaganj, Baberu, Banda, Uttar Pradesh. The site covers 2.8 acres. Its stated project cost is ₹45 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 30 Jan 2026).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand/Morrum mining from Riverbed of Baghain River, at Khasra/Gata No. 21 Ka, Lease Area-1.1380 ha is an approved mining project in Oihaganj, Baberu, Banda, Uttar Pradesh. The site covers 2.8 acres.

Who is building it?

The applicant is Sherbahadur Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 30 Jan 2026), as of 27 Nov 2026.

Where is it?

In Oihaganj, Baberu, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹45 lakh and a site of 2.8 acres.

When was it filed?

The application was filed on 17 Sept 2025.

Project details

Official titleSand/Morrum mining from Riverbed of Baghain River, at Khasra/Gata No. 21 Ka, Lease Area-1.1380 ha at Village-Gadauli, Tehsil-Rajapur, District-Chitrakoot, Uttar Pradesh of Shri Sherbahadur Singh
StatusEnvironmental approval granted
Status since30 Jan 2026
Application filed17 Sept 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSherbahadur Singh
Land area2.8 acres (1.1 ha)
Project cost₹45 lakh
Village / localityOihaganj
Taluk / tehsilBaberu
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03311

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.8 acres, this one is smaller than 95% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Oihaganj, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.