Quick answers
What is this project?
Sand/Morrum mining from Riverbed of Baghain River, at Khasra/Gata No. 21 Ka, Lease Area-1.1380 ha is an approved mining project in Oihaganj, Baberu, Banda, Uttar Pradesh. The site covers 2.8 acres.
Who is building it?
The applicant is Sherbahadur Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Jan 2026), as of 27 Nov 2026.
Where is it?
In Oihaganj, Baberu, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹45 lakh and a site of 2.8 acres.
When was it filed?
The application was filed on 17 Sept 2025.
Project details
| Official title | Sand/Morrum mining from Riverbed of Baghain River, at Khasra/Gata No. 21 Ka, Lease Area-1.1380 ha at Village-Gadauli, Tehsil-Rajapur, District-Chitrakoot, Uttar Pradesh of Shri Sherbahadur Singh |
|---|---|
| Status | Environmental approval granted |
| Status since | 30 Jan 2026 |
| Application filed | 17 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sherbahadur Singh |
| Land area | 2.8 acres (1.1 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Oihaganj |
| Taluk / tehsil | Baberu |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03311 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.8 acres, this one is smaller than 95% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Oihaganj, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Ordinary Sand/Morrrum Mining at Gata No. 200, Village- Dighari,… — lapsed, 11.4 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — initial checks, 13.1 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review, 13.1 km away
- Sand/Morrum Mine from Riverbed of Baghein River — environmental approval granted, 14.7 km away
- Sand/Morrum Mine from Riverbed of Baghein River — cleared for impact study, 14.7 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 22.6 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study, 22.6 km away
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Neo… — environmental approval granted, 23 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.