Quick answers
What is Sand/Morrum Mine from Riverbed of Baghein River?
Sand/Morrum Mine from Riverbed of Baghein River is an approved mining project in Itwan, Baberu, Banda, Uttar Pradesh. The site covers 20.1 acres.
Who is building it?
The applicant is Shri Anand Kumar Gupta.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 May 2025), as of 27 Nov 2026.
Where is it?
In Itwan, Baberu, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 20.1 acres.
When was it filed?
The application was filed on 30 Dec 2024.
Project details
| Official title | Sand/Morrum Mine from Riverbed of Baghein River at Village- Itwan, [Gata No. – 3257, 3276 Mi & 3278, Sanctioned Mining Lease Area – 8.152 ha. (20.14 Acres)] Tehsil- Baberu, District- Banda, Uttar Pradesh, Project Proponent- Shri Anand Kumar Gupta |
|---|---|
| Status | Environmental approval granted |
| Status since | 28 May 2025 |
| Application filed | 30 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shri Anand Kumar Gupta |
| Land area | 20.1 acres (8.2 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Itwan |
| Taluk / tehsil | Baberu |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01486 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Dec 2024 (this page) | Environmental approval granted | 20.1 acres | ₹1.5 crore |
| Early planning filed 21 Aug 2024 | Cleared for impact study | 20.1 acres | ₹1.5 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 20.1 acres, this one is smaller than 72% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Itwan, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mine from Riverbed of Baghein River — cleared for impact study, 0 m away
- Riverbed Ordinary Sand/Morrrum Mining at Gata No. 200, Village- Dighari,… — lapsed, 3.5 km away
- "Riverbed Sand/Morrum" Mining from Riverbed of Baghein River from Village-… — environmental approval granted, 13.1 km away
- "Riverbed Sand/Morrum" Mining from Riverbed of Baghein River from Village-… — cleared for impact study, 13.1 km away
- Sand/Morrum mining from Riverbed of Baghain River, at Khasra/Gata No. 21 Ka,… — environmental approval granted, 14.7 km away
- "Sand/Morrum Mining" from Riverbed of Baghain River — lapsed, 20.7 km away
- Proposed riverbed sand/morrum mining project from Baghen River of M/s JMD… — lapsed, 20.7 km away
- Transfer of Environment Clearance (EC) of Riverbed Sand/Morrum mining project… — lapsed, 20.7 km away
More from Shri Anand Kumar Gupta in Banda
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted
- Sand/Morrum Mine from Riverbed of Ken River, Village- Marauli Khadar, Gata… — environmental approval granted
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study
- Sand/Morrum Mine from Riverbed of Ken River, Village- Marauli Khadar, Gata… — cleared for impact study
- Sand/Morrum Mine from Riverbed of Yamuna River — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.