Environmental approval grantedMining · Banda, Uttar Pradesh

Sand/Morrum Mine from Riverbed of Baghein River

Sand/Morrum Mine from Riverbed of Baghein River is an approved mining project in Itwan, Baberu, Banda, Uttar Pradesh. The site covers 20.1 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 28 May 2025).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Sand/Morrum Mine from Riverbed of Baghein River?

Sand/Morrum Mine from Riverbed of Baghein River is an approved mining project in Itwan, Baberu, Banda, Uttar Pradesh. The site covers 20.1 acres.

Who is building it?

The applicant is Shri Anand Kumar Gupta.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 28 May 2025), as of 27 Nov 2026.

Where is it?

In Itwan, Baberu, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.5 crore and a site of 20.1 acres.

When was it filed?

The application was filed on 30 Dec 2024.

Project details

Official titleSand/Morrum Mine from Riverbed of Baghein River at Village- Itwan, [Gata No. – 3257, 3276 Mi & 3278, Sanctioned Mining Lease Area – 8.152 ha. (20.14 Acres)] Tehsil- Baberu, District- Banda, Uttar Pradesh, Project Proponent- Shri Anand Kumar Gupta
StatusEnvironmental approval granted
Status since28 May 2025
Application filed30 Dec 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantShri Anand Kumar Gupta
Land area20.1 acres (8.2 ha)
Project cost₹1.5 crore
Village / localityItwan
Taluk / tehsilBaberu
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01486

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Dec 2024 (this page)Environmental approval granted20.1 acres₹1.5 crore
Early planning filed 21 Aug 2024Cleared for impact study20.1 acres₹1.5 crore

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 20.1 acres, this one is smaller than 72% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Itwan, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shri Anand Kumar Gupta in Banda

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.