Quick answers
What is "Sand/Morrum Mining" from Riverbed of Yamuna River?
"Sand/Morrum Mining" from Riverbed of Yamuna River is a proposed mining project in Amerhi, Baberu, Banda, Uttar Pradesh. The site covers 43.2 acres.
Who is building it?
The applicant is Jmd Group.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Amerhi, Baberu, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 43.2 acres.
When was it filed?
The application was filed on 18 Oct 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Yamuna River
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Yamuna River at Village- Amedhi Khadar, Gata No.- 69/94, 69/95, Part of 69/96 (Khand No.- 02), lease area- 17.50 ha. (43.24 Acre), Tehsil- Baberu, District- Banda, Uttar Pradesh, Project Proponent- M/s J. M. D. Group (Partner – Shri Abhishek) |
|---|---|
| Status | Initial checks |
| Status since | 18 Oct 2026 |
| Application filed | 18 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jmd Group |
| Land area | 43.2 acres (17.5 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Amerhi |
| Taluk / tehsil | Baberu |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04711 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Oct 2026 (this page) | Initial checks | 43.2 acres | ₹1.5 crore |
| Early planning filed 9 Apr 2026 | Under environmental review | 43.2 acres | ₹1.5 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 43.2 acres, this one is larger than 58% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Amerhi, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review, 0 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 12.5 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study, 12.5 km away
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Neo… — environmental approval granted, 12.8 km away
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Neo… — cleared for impact study, 12.8 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 13.1 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study, 13.1 km away
- Sand/Morrum mining from Riverbed of Baghain River, at Khasra/Gata No. 21 Ka,… — environmental approval granted, 13.1 km away
More from Jmd Group in Banda
- "Sand/Morrum Mining" from Riverbed of Baghain River — lapsed
- Proposed riverbed sand/morrum mining project from Baghen River of M/s JMD… — lapsed
- Transfer of Environment Clearance (EC) of Riverbed Sand/Morrum mining project… — lapsed
All 5 Jmd Group projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.