Quick answers
What is "Sand/Morrum Mining" from Riverbed of Betwa River?
"Sand/Morrum Mining" from Riverbed of Betwa River is a lapsed mining project in Kandaur, Hamirpur, Uttar Pradesh. The site covers 76 acres.
Who is building it?
The applicant is Satya Prakash Gupta.
Has it been approved?
No. The application was lapsed on 10 Jan 2025, so it is no longer under consideration.
Where is it?
In Kandaur, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 76 acres.
When was it filed?
The application was filed on 19 Nov 2024.
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Betwa River at Village- Kandaur, Khand No.- 9/3, Lease Area- 30.7560 Ha. (76 Acres), Tehsil- Hamirpur, District- Hamirpur, Uttar Pradesh, Project Proponent- M/s Maa Vaishno Agro Industries (Prop.- Shri Satya Prakash Gupta) |
|---|---|
| Status | Lapsed |
| Status since | 10 Jan 2025 |
| Application filed | 19 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Satya Prakash Gupta |
| Land area | 76 acres (30.8 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Kandaur |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02303 |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 76 acres, this one is larger than 74% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Kandaur, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 0 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 0 m away
- Kandaur Dariya Morrum Deposit (Area 20.0 Ha.) — under environmental review, 650 m away
- Proposed project of Sand/Morrum Mining project at Khand No.-19/13, Gata No.-… — under environmental review, 2 km away
- Proposed project of Sand/Morrum Mining project at Khand No.-19/13, Gata No.-… — cleared for impact study, 2 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — cleared for impact study, 2.3 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — returned to applicant, 2.4 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — initial checks, 2.4 km away
More from Satya Prakash Gupta in Hamirpur
- Sand/Morrum Mining at Betwa River Bed, Gata No.- 35/1, Khand No.-22/14, Area –… — environmental approval granted
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted
- "Sand/Morrum Mining" along Betwa Riverbed in Khand No – 22/15, Gata no 35/1,… — withdrawn
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study
- Sand/Morrum Mining at Betwa River Bed, Gata No.- 35/1, Khand No.-22/14, Area –… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.