Quick answers
What is this project?
"Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River is a proposed mining project in Nityanandpur Aht, Behat, Saharanpur, Uttar Pradesh. The site covers 43.7 acres.
Who is building it?
The applicant is Era Control Systems Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 17 Jan 2026), as of 27 Nov 2026.
Where is it?
In Nityanandpur Aht, Behat, Saharanpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2.1 crore and a site of 43.7 acres.
When was it filed?
The application was filed on 18 Sept 2025.
Project details
| Official title | "Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River at Village- Nityanandpur Aehatmal and Saidmohamadpur Aehatmal, Gata No.- 1 & 1Ma, Lease Area- 17.70 Ha., Tehsil- Behat, District- Saharanpur, Uttar Pradesh, Project Proponent- M/s Era Control Systems Private Limited (Authorized Partner -Ramhit Singh) |
|---|---|
| Status | Cleared for impact study |
| Status since | 17 Jan 2026 |
| Application filed | 18 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Era Control Systems Private Limited |
| Land area | 43.7 acres (17.7 ha) |
| Project cost | ₹2.1 crore |
| Village / locality | Nityanandpur Aht |
| Taluk / tehsil | Behat |
| District | Saharanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02955 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Apr 2026 | More information requested | 43.7 acres | ₹2.1 crore |
| Early planning filed 18 Sept 2025 (this page) | Cleared for impact study | 43.7 acres | ₹2.1 crore |
In context
43 applications in Saharanpur since January 2022 are in the same category (Mining): 34 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 43.7 acres, this one is smaller than 51% of them.
No other mining lease on record is within 500 m of this site; 12 have applied within 5 km.
Where it is
Nityanandpur Aht, Behat, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River — more information requested, 0 m away
- Proposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 व 1, (Total… — environmental approval granted, 500 m away
- Proposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 व 1, (Total… — cleared for impact study, 500 m away
- "Sand/ Bajri/ Boulder Excavation (RBM) Mining Project" — environmental approval granted, 600 m away
- "Sand/ Bajri/ Boulder Excavation (RBM) Mining Project" — cleared for impact study, 600 m away
- Proposed Project of "Sand/ Bajri/ Boulder Excavation (RBM) Mining Project" at… — under environmental review, 600 m away
- "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 (Total area 15.7000… — environmental approval granted, 950 m away
- "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 (Total area 15.7000… — cleared for impact study, 950 m away
All 4 Era Control Systems projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.