Cleared for impact studyMining · Saharanpur, Uttar Pradesh

"Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River

"Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River is a proposed mining project in Nityanandpur Aht, Behat, Saharanpur, Uttar Pradesh. The site covers 43.7 acres. Its stated project cost is ₹2.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Jan 2026).

See it on the live map All projects in Saharanpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River is a proposed mining project in Nityanandpur Aht, Behat, Saharanpur, Uttar Pradesh. The site covers 43.7 acres.

Who is building it?

The applicant is Era Control Systems Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Jan 2026), as of 27 Nov 2026.

Where is it?

In Nityanandpur Aht, Behat, Saharanpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹2.1 crore and a site of 43.7 acres.

When was it filed?

The application was filed on 18 Sept 2025.

Project details

Official title"Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River at Village- Nityanandpur Aehatmal and Saidmohamadpur Aehatmal, Gata No.- 1 & 1Ma, Lease Area- 17.70 Ha., Tehsil- Behat, District- Saharanpur, Uttar Pradesh, Project Proponent- M/s Era Control Systems Private Limited (Authorized Partner -Ramhit Singh)
StatusCleared for impact study
Status since17 Jan 2026
Application filed18 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantEra Control Systems Private Limited
Land area43.7 acres (17.7 ha)
Project cost₹2.1 crore
Village / localityNityanandpur Aht
Taluk / tehsilBehat
DistrictSaharanpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02955

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 17 Apr 2026More information requested43.7 acres₹2.1 crore
Early planning filed 18 Sept 2025 (this page)Cleared for impact study43.7 acres₹2.1 crore

In context

43 applications in Saharanpur since January 2022 are in the same category (Mining): 34 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 43.7 acres, this one is smaller than 51% of them.

No other mining lease on record is within 500 m of this site; 12 have applied within 5 km.

Where it is

Nityanandpur Aht, Behat, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Era Control Systems projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.