Quick answers
What is this project?
Sundarwali Sand Mining Project, Located on river bed of Khoh River (1.960 ha) is an approved mining project in Sundarwali, Nagina, Bijnor, Uttar Pradesh. The site covers 4.8 acres.
Who is building it?
The applicant is Subhash Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Feb 2026), as of 27 Nov 2026.
Where is it?
In Sundarwali, Nagina, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹4.9 crore and a site of 4.8 acres.
When was it filed?
The application was filed on 5 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Feb 2026 |
| Application filed | 5 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Subhash Singh |
| Land area | 4.8 acres (2 ha) |
| Project cost | ₹4.9 crore |
| Village / locality | Sundarwali |
| Taluk / tehsil | Nagina |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02970 |
In context
24 applications in Bijnor since January 2022 are in the same category (Mining): 15 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.8 acres, this one is larger than 54% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Sundarwali, Nagina, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of "Sand- Bajri-Boulders in Mixed State (RBM) Mine" located… — environmental approval granted, 5.2 km away
- Proposed Project of "Sand- Bajri-Boulders in Mixed State (RBM) Mine" located… — cleared for impact study, 5.2 km away
- "R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining" Project at Gata No.- 400… — environmental approval granted, 5.6 km away
- "R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining" Project at Gata No.- 400… — cleared for impact study, 5.6 km away
- "RBM (MIXED FORM) Mining Project" at Gata No. – 70Mi, (Total area 1.265 Ha.) — environmental approval granted, 6.3 km away
- Proposed Project of "RBM Mine (Mixed Form)" located at Gata No. 70 Mi, Total… — initial checks, 6.3 km away
- RBM (Mixed Form) Mining Project at (Khoh River) — environmental approval granted, 6.9 km away
- "RBM (Mixed Form)" at Gata No. 2/102, Area- 1.215 Ha, Village- Shah Alipur… — environmental approval granted, 7.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.