Quick answers
What is Sukhnai Pumped Storage Project?
Sukhnai Pumped Storage Project is a proposed water and irrigation project in Babura Raghunath Singh, Lalganj, Mirzapur, Uttar Pradesh. The site covers 1,683.7 acres.
Who is building it?
The applicant is Hinduja Renewables Energy Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Babura Raghunath Singh, Lalganj, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹5,950 crore and a site of 1,683.7 acres.
When was it filed?
The application was filed on 24 Mar 2025.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 22 Apr 2025 |
| Application filed | 24 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Hinduja Renewables Energy Private Limited |
| Land area | 1,683.7 acres (681.4 ha) |
| Project cost | ₹5,950 crore |
| Village / locality | Babura Raghunath Singh |
| Taluk / tehsil | Lalganj |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02997 |
In context
6 applications in Mirzapur since January 2022 are in the same category (Water & irrigation): 2 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Babura Raghunath Singh, Lalganj, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sukhnai Pumped Storage Project — cleared for impact study, 800 m away
- Sukhnai Off-stream Closed Loop PSP — withdrawn, 800 m away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 1.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — lapsed, 2.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed, 2.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 3.8 km away
- Kalu Patti PSP (1000 MW) — under environmental review, 7 km away
- Kalu Patti Pumped Storage Project (1000 MW) — lapsed, 7 km away
More from Hinduja Renewables Energy Private Limited in Mirzapur
- Sukhnai Pumped Storage Project — cleared for impact study
- Sukhnai Off-stream Closed Loop PSP — withdrawn
3 Hinduja Renewables Energy projects in Mirzapur
All 4 Hinduja Renewables Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.