Quick answers
What is this project?
Proposed Project of "Sand/Morrum Mining" at Gata No. 240 (Khand No. 04), Mining Lease Area 16.195 ha, Village: Himanpura, Tehsil: Kalpi, District Jalaun, Uttar Pradesh.Project Proponent-Shri Dheerendra Gupta is a proposed mining project in Himanpura, Kalpi, Jalaun, Uttar Pradesh. The site covers 40 acres.
Who is building it?
The applicant is Dheerendra Gupta.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 May 2025), as of 27 Nov 2026.
Where is it?
In Himanpura, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹85 lakh and a site of 40 acres.
When was it filed?
The application was filed on 11 Jan 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of "Sand/Morrum Mining" at Gata No. 240 (Khand No. 04), Mining Lease…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 May 2025 |
| Application filed | 11 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Dheerendra Gupta |
| Land area | 40 acres (16.2 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Himanpura |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03013 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Nov 2025 | Environmental approval granted | 40 acres | ₹85 lakh |
| Early planning filed 11 Jan 2025 (this page) | Cleared for impact study | 40 acres | ₹85 lakh |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 40 acres, this one is larger than 52% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 73 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 19 mining leases have applied within 5 km.
Where it is
Himanpura, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of "Sand/Morrum Mining" at Gata No. 240 (Khand No. 04),… — environmental approval granted, 0 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — under environmental review, 350 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — cleared for impact study, 350 m away
- Riverbed Sand/ Morrum Mining from Betwa River — environmental approval granted, 750 m away
- Riverbed Sand/ Morrum Mining from Betwa River — cleared for impact study, 750 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — initial checks, 750 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 750 m away
- Riverbed Sand/Morrum Mining Project having lease area 20.20 ha (50.0 acre)… — environmental approval granted, 750 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.