What is Developing? Open the mapMap

Cleared for impact studyMining · Jalaun, Uttar Pradesh

Riverbed Sand/ Morrum Mining from Betwa River

Riverbed Sand/ Morrum Mining from Betwa River is a proposed mining project in Kyotara, Kalpi, Jalaun, Uttar Pradesh. The site covers 40 acres. Its stated project cost is ₹6 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 8 Oct 2024).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Riverbed Sand/ Morrum Mining from Betwa River?

Riverbed Sand/ Morrum Mining from Betwa River is a proposed mining project in Kyotara, Kalpi, Jalaun, Uttar Pradesh. The site covers 40 acres.

Who is building it?

The applicant is Girish Gupta.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 8 Oct 2024), as of 27 Nov 2026.

Where is it?

In Kyotara, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹6 crore and a site of 40 acres.

When was it filed?

The application was filed on 17 May 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Riverbed Sand/ Morrum Mining from Betwa River

Project details

StatusCleared for impact study
Status since8 Oct 2024
Application filed17 May 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantGirish Gupta
Land area40 acres (16.2 ha)
Project cost₹6 crore
Village / localityKyotara
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02274

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 8 Feb 2025Environmental approval granted40 acres₹6 crore
Early planning filed 17 May 2024 (this page)Cleared for impact study40 acres₹6 crore

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 40 acres, this one is smaller than 53% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 85 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 19 mining leases have applied within 5 km.

Where it is

Kyotara, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.