Cleared for impact studyMining · Jalaun, Uttar Pradesh

Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Gata No- 240, Khand No. 03, Area- 13.360 ha

Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Gata No- 240, Khand No. 03, Area- 13.360 ha is a proposed mining project in Himanpura, Kalpi, Jalaun, Uttar Pradesh. The site covers 33 acres. Its stated project cost is ₹40 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 30 Jan 2026).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Gata No- 240, Khand No. 03, Area- 13.360 ha is a proposed mining project in Himanpura, Kalpi, Jalaun, Uttar Pradesh. The site covers 33 acres.

Who is building it?

The applicant is Vimal Kumar Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 30 Jan 2026), as of 27 Nov 2026.

Where is it?

In Himanpura, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹40 lakh and a site of 33 acres.

When was it filed?

The application was filed on 24 Sept 2025.

Project details

Official titleProposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Gata No- 240, Khand No. 03, Area- 13.360 ha in Village- Hemanpura, Tehsil- Kalpi, District- Jalaun, Uttar Pradesh of Shri Vimal Kumar Singh
StatusCleared for impact study
Status since30 Jan 2026
Application filed24 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantVimal Kumar Singh
Land area33 acres (13.4 ha)
Project cost₹40 lakh
Village / localityHimanpura
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03712

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 9 Jun 2026Under environmental review33 acres₹40 lakh
Early planning filed 24 Sept 2025 (this page)Cleared for impact study33 acres₹40 lakh

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 33 acres, this one is smaller than 70% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 173 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.

Where it is

Himanpura, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.