Quick answers
What is this project?
Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Gata No- 240, Khand No. 03, Area- 13.360 ha is a proposed mining project in Himanpura, Kalpi, Jalaun, Uttar Pradesh. The site covers 33 acres.
Who is building it?
The applicant is Vimal Kumar Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 30 Jan 2026), as of 27 Nov 2026.
Where is it?
In Himanpura, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹40 lakh and a site of 33 acres.
When was it filed?
The application was filed on 24 Sept 2025.
Project details
| Official title | Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Gata No- 240, Khand No. 03, Area- 13.360 ha in Village- Hemanpura, Tehsil- Kalpi, District- Jalaun, Uttar Pradesh of Shri Vimal Kumar Singh |
|---|---|
| Status | Cleared for impact study |
| Status since | 30 Jan 2026 |
| Application filed | 24 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Vimal Kumar Singh |
| Land area | 33 acres (13.4 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Himanpura |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03712 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Jun 2026 | Under environmental review | 33 acres | ₹40 lakh |
| Early planning filed 24 Sept 2025 (this page) | Cleared for impact study | 33 acres | ₹40 lakh |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 33 acres, this one is smaller than 70% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 173 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.
Where it is
Himanpura, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — under environmental review, 0 m away
- Proposed Project of "Sand/Morrum Mining" at Gata No. 240 (Khand No. 04),… — environmental approval granted, 350 m away
- Proposed Project of "Sand/Morrum Mining" at Gata No. 240 (Khand No. 04),… — cleared for impact study, 350 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — initial checks, 400 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 400 m away
- Riverbed Sand/Morrum Mining Project having lease area 20.20 ha (50.0 acre)… — environmental approval granted, 400 m away
- Riverbed Sand/Morrum Mining Project having lease area 20.20 ha (50.0 acre)… — cleared for impact study, 400 m away
- Riverbed Sand/ Morrum Mining from Betwa River — environmental approval granted, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.