Quick answers
What is "Sand/Morrum Mining" from Riverbed of Dhasan River?
"Sand/Morrum Mining" from Riverbed of Dhasan River is a proposed mining project in Bilgaon, Sarila, Hamirpur, Uttar Pradesh. The site covers 37.1 acres.
Who is building it?
The applicant is B T Infra Heights Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 17 Oct 2025), as of 27 Nov 2026.
Where is it?
In Bilgaon, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹35.5 crore and a site of 37.1 acres.
When was it filed?
The application was filed on 31 May 2025.
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Dhasan River at Village- Bilgaon, Gata No.- 1/1, Khand No.- 01, Lease Area- 15.00 Ha., Tehsil- Sarila, District- Hamirpur, Uttar Pradesh, Project Proponent- M/s B T Infra Heights Pvt. Ltd. (Director- Smt. Meenu Gupta) |
|---|---|
| Status | Cleared for impact study |
| Status since | 17 Oct 2025 |
| Application filed | 31 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | B T Infra Heights Private Limited |
| Land area | 37.1 acres (15 ha) |
| Project cost | ₹35.5 crore |
| Village / locality | Bilgaon |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03304 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Apr 2026 | Under environmental review | 37.1 acres | ₹35.5 crore |
| Early planning filed 31 May 2025 (this page) | Cleared for impact study | 37.1 acres | ₹35.5 crore |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 37.1 acres, this one is smaller than 70% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Bilgaon, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Dhasan River — under environmental review, 0 m away
- Proposed Project of Sand/Morrum Mining from Riverbed of Dhasan River at Gata… — under environmental review, 1 km away
- Proposed Project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — withdrawn, 1 km away
- Sand/Morrum Mine from Riverbed of Dhasan River, Village- Jigni, Gata No.- 01… — environmental approval granted, 2.4 km away
- Sand/Morrum Mine from Riverbed of Dhasan River, Village- Jigni, Gata No.- 01… — cleared for impact study, 2.4 km away
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — under environmental review, 3.1 km away
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — cleared for impact study, 3.1 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Chandwari Ghurauli,… — environmental approval granted, 4.2 km away
More from B T Infra Heights Private Limited in Hamirpur
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study
All 4 B T Infra Heights projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.