Quick answers
What is this project?
Proposed Project of Sand/Morrum Mining from Riverbed of Betwa River at Gata No- 1/1, Khand No. 02, Area- 12.00 ha, Village- Bilgaon, Tehsil- Sarila, District- Hamirpur, Uttar Pradesh of M/s V K Enterprises, Prop. Virendra Kumar is a withdrawn mining project in Bilgaon, Sarila, Hamirpur, Uttar Pradesh. The site covers 29.7 acres.
Who is building it?
The applicant is Virendra Kumar.
Has it been approved?
No. The application was withdrawn on 23 Jul 2026, so it is no longer under consideration.
Where is it?
In Bilgaon, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹85 lakh and a site of 29.7 acres.
When was it filed?
The application was filed on 23 Jul 2026.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 23 Jul 2026 |
| Application filed | 23 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Virendra Kumar |
| Land area | 29.7 acres (12 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Bilgaon |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04430 |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 29.7 acres, this one is smaller than 90% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Bilgaon, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of Sand/Morrum Mining from Riverbed of Dhasan River at Gata… — under environmental review, 0 m away
- "Sand/Morrum Mining" from Riverbed of Dhasan River — under environmental review, 1 km away
- "Sand/Morrum Mining" from Riverbed of Dhasan River — cleared for impact study, 1 km away
- Sand/Morrum Mine from Riverbed of Dhasan River, Village- Jigni, Gata No.- 01… — environmental approval granted, 1.5 km away
- Sand/Morrum Mine from Riverbed of Dhasan River, Village- Jigni, Gata No.- 01… — cleared for impact study, 1.5 km away
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — under environmental review, 3.2 km away
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — cleared for impact study, 3.2 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Chandwari Ghurauli,… — environmental approval granted, 3.7 km away
More from Virendra Kumar in Hamirpur
- Proposed Project of Sand/Morrum Mining from Riverbed of Dhasan River at Gata… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.