Project details
| Official title | Proposal for establishment of Grain based distillery plant of capacity - 500 KLD along with Co Gen Power – 14 MW at , Village: Salpur Navdia, Tehsil: Tilhar & District: Shahjahanpur, State: Uttar Pradesh by M/s Rajshree Fine Chemical Industries Pvt Ltd., Unit-II. |
|---|---|
| Status | Environmental approval granted |
| Status since | 26 Sept 2025 |
| Application filed | 10 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Rajshree Fine Chemical Industries India Private Limited |
| Land area | 33.3 acres (13.5 ha) |
| Project cost | ₹410 crore |
| Village / locality | Shalpur Navdia |
| Taluk / tehsil | Tilhar |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03096 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Aug 2025 (this page) | Environmental approval granted | 33.3 acres | ₹410 crore |
| Early planning filed 28 Aug 2024 | Cleared for impact study | 33.3 acres | ₹410 crore |
In context
29 applications in Shahjahanpur since January 2022 are in the same category (Industry): 25 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 33.3 acres, this one is larger than 66% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shalpur Navdia, Tilhar, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Grain based distillery plant of capacity - 500 KLD — cleared for impact study, 0 m away
- Protected Forest Land 0.7967 Hectare proposed for diversion for Entry/Exit… — forest land use approved, 800 m away
- Proposed Standalone Grinding Unit with Cement Production Capacity of 3.0… — environmental approval granted, 800 m away
- Proposed Standalone Grinding Unit with Cement Production Capacity of 3.0… — cleared for impact study, 800 m away
- Proposed Forest Land to be diverted for Laying of Carbon Steel Pipeline — under forest review, 3.1 km away
- Proposed Forest Land to be diverted for Laying of Carbon Steel Pipeline — lapsed, 3.1 km away
- Tilhar-Khudaganj OFC laying under Block Connectivity — lapsed, 5.6 km away
- Protected Forest Land Proposed to be diverted for Entry/Exit approach to… — in-principle approval, conditions pending, 7.1 km away