Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Jul 2026 |
| Application filed | 23 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Forest land | 1,200 m² |
| Project cost | ₹35 lakh |
| Village / locality | Chandipur |
| Taluk / tehsil | Tilhar |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05430 |
In context
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chandipur, Tilhar, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be diverted for Laying of Carbon Steel Pipeline — under forest review, 4.8 km away
- Proposed Forest Land to be diverted for Laying of Carbon Steel Pipeline — lapsed, 4.8 km away
- Proposed Standalone Grinding Unit with Cement Production Capacity of 3.0… — environmental approval granted, 4.8 km away
- Proposed Standalone Grinding Unit with Cement Production Capacity of 3.0… — cleared for impact study, 4.8 km away
- Protected Forest Land 0.7967 Hectare proposed for diversion for Entry/Exit… — forest land use approved, 4.9 km away
- Grain based distillery plant of capacity - 500 KLD — environmental approval granted, 5.6 km away
- Grain based distillery plant of capacity - 500 KLD — cleared for impact study, 5.6 km away
- Protected Forest Land Proposed to be diverted for Entry/Exit approach to… — in-principle approval, conditions pending, 7.6 km away
More from Mahesh Nair in Shahjahanpur
- Tilhar-Jaiteepur Ofc Laying Under Block Connectivity — initial checks
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.