Quick answers
What is Sand/Moram Mining at Yamuna River Bed?
Sand/Moram Mining at Yamuna River Bed is a proposed mining project in Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh. The site covers 37.1 acres.
Who is building it?
The applicant is Vaibhav Gupta.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 10 Jun 2025), as of 27 Nov 2026.
Where is it?
In Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹54 lakh and a site of 37.1 acres.
When was it filed?
The application was filed on 6 May 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand/Moram Mining at Yamuna River Bed
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 10 Jun 2025 |
| Application filed | 6 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Vaibhav Gupta |
| Land area | 37.1 acres (15 ha) |
| Project cost | ₹54 lakh |
| Village / locality | Hirapur Divara |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03154 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Nov 2025 | Environmental approval granted | 37.1 acres | ₹54 lakh |
| Early planning filed 6 May 2025 (this page) | Cleared for impact study | 37.1 acres | ₹54 lakh |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 37.1 acres, this one is smaller than 66% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 148.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Moram Mining at Yamuna River Bed — environmental approval granted, 0 m away
- Proposed Sand/Morrum Mining Project along Yamuna Riverbed — environmental approval granted, 250 m away
- Proposed Sand/Morrum Mining Project along Yamuna Riverbed — environmental approval granted, 250 m away
- Proposed Sand/Morrum Mining Project along Yamuna Riverbed — cleared for impact study, 250 m away
- Sand/ Morrum Mining from Yamuna Riverbed — cleared for impact study, 300 m away
- SAND/MORRUM MINING ALONG YAMUNA RIVERBED OVER AN AREA OF 15 ha. AT GATA NO.… — under environmental review, 550 m away
- Sand/Morrum Mining along Yamuna Riverbed" at Gata No. 169/9, 170/1, Khand… — under environmental review, 900 m away
- Proposed Project of riverbed "Morrum Mining" on the riverbed of Yamuna River… — under environmental review, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.