Quick answers
What is this project?
Sand/Morrum Mining along Yamuna Riverbed" at Gata No. 169/9, 170/1, Khand No-05, Area – 15 ha, Village- Heerapur Devara, Tehsil- Kalpi, District- Jalaun, State- Uttar Pradesh by M/s Singh Construction & Supplyers, Proprietor- Somendra Singh is a proposed mining project in Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh. The site covers 37.1 acres.
Who is building it?
The applicant is Somendra Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹85 lakh and a site of 37.1 acres.
When was it filed?
The application was filed on 16 May 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 23 Jul 2026 |
| Application filed | 16 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Somendra Singh |
| Land area | 37.1 acres (15 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Hirapur Divara |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04309 |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 37.1 acres, this one is smaller than 66% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 74.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- SAND/MORRUM MINING ALONG YAMUNA RIVERBED OVER AN AREA OF 15 ha. AT GATA NO.… — under environmental review, 350 m away
- Proposed Sand/Morrum Mining Project along Yamuna Riverbed — environmental approval granted, 650 m away
- Proposed Sand/Morrum Mining Project along Yamuna Riverbed — environmental approval granted, 650 m away
- Proposed Sand/Morrum Mining Project along Yamuna Riverbed — cleared for impact study, 650 m away
- Sand/Moram Mining at Yamuna River Bed — environmental approval granted, 900 m away
- Sand/Moram Mining at Yamuna River Bed — cleared for impact study, 900 m away
- Sand/ Morrum Mining from Yamuna Riverbed — cleared for impact study, 1.1 km away
- Proposed Project of riverbed "Morrum Mining" on the riverbed of Yamuna River… — under environmental review, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.