Under environmental reviewMining · Jalaun, Uttar Pradesh

SAND/MORRUM MINING ALONG YAMUNA RIVERBED OVER AN AREA OF 15 ha. AT GATA NO. 169/9, 170/1, KHAND NO-04, VILLAGE- HEERAPUR DEVARA, TEHSIL- KALPI, DISTRICT- JALAUN, STATE- UTTAR PRADESH

SAND/MORRUM MINING ALONG YAMUNA RIVERBED OVER AN AREA OF 15 ha. AT GATA NO. 169/9, 170/1, KHAND NO-04, VILLAGE- HEERAPUR DEVARA, TEHSIL- KALPI, DISTRICT- JALAUN, STATE- UTTAR PRADESH is a proposed mining project in Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh. The site covers 37.1 acres. Its stated project cost is ₹85 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 23 Jul 2026).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

SAND/MORRUM MINING ALONG YAMUNA RIVERBED OVER AN AREA OF 15 ha. AT GATA NO. 169/9, 170/1, KHAND NO-04, VILLAGE- HEERAPUR DEVARA, TEHSIL- KALPI, DISTRICT- JALAUN, STATE- UTTAR PRADESH is a proposed mining project in Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh. The site covers 37.1 acres.

Who is building it?

The applicant is Ravi Panjwani.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹85 lakh and a site of 37.1 acres.

When was it filed?

The application was filed on 16 May 2026.

Project details

StatusUnder environmental review
Status since23 Jul 2026
Application filed16 May 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRavi Panjwani
Land area37.1 acres (15 ha)
Project cost₹85 lakh
Village / localityHirapur Divara
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05013

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 37.1 acres, this one is smaller than 66% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 148.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.

Where it is

Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ravi Panjwani in Jalaun

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.