Environmental approval grantedMining · Jalaun, Uttar Pradesh

Proposed Sand/Morrum Mining Project along Yamuna Riverbed

Proposed Sand/Morrum Mining Project along Yamuna Riverbed is an approved mining project in Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh. The site covers 74.1 acres. Its stated project cost is ₹54 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 5 Dec 2025).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Proposed Sand/Morrum Mining Project along Yamuna Riverbed?

Proposed Sand/Morrum Mining Project along Yamuna Riverbed is an approved mining project in Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh. The site covers 74.1 acres.

Who is building it?

The applicant is Ravi Panjwani.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 5 Dec 2025), as of 27 Nov 2026.

Where is it?

In Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹54 lakh and a site of 74.1 acres.

When was it filed?

The application was filed on 2 Sept 2025.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand/Morrum Mining Project along Yamuna Riverbed

Project details

StatusEnvironmental approval granted
Status since5 Dec 2025
Application filed2 Sept 2025
Approval soughtEnvironmental approval
Application typeAmendment
SectorMining
ApplicantRavi Panjwani
Land area74.1 acres (30 ha)
Project cost₹54 lakh
Village / localityHirapur Divara
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03404

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 18 Nov 2025Environmental approval granted74.1 acres₹54 lakh
Amendment filed 2 Sept 2025 (this page)Environmental approval granted74.1 acres₹54 lakh
Early planning filed 5 May 2025Cleared for impact study74.1 acres₹54 lakh

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 74.1 acres, this one is larger than 97% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 148.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.

Where it is

Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.