Quick answers
What is this project?
Project for Construction of Pailani Barrage on Ken River under Ken Betwa Link Project is a proposed water and irrigation project in Amlor, Banda, Uttar Pradesh. The site covers 6,609.1 acres.
Who is building it?
The applicant is Executive Engineer Ken Betwa Link Canal Construction Division -1 Mahoba.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Amlor, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2,480.6 crore and a site of 6,609.1 acres.
When was it filed?
The application was filed on 26 Jul 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Project for Construction of Pailani Barrage on Ken River under Ken Betwa Link Project
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 11 Feb 2026 |
| Application filed | 26 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Executive Engineer Ken Betwa Link Canal Construction Division -1 Mahoba |
| Land area | 6,609.1 acres (2,674.6 ha) |
| Project cost | ₹2,480.6 crore |
| Village / locality | Amlor |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03286 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Nov 2025 | More information requested | 6,609.1 acres | ₹2,480.6 crore |
| Early planning filed 26 Jul 2025 (this page) | Returned to applicant | 6,609.1 acres | ₹2,480.6 crore |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amlor, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for Construction of Pailani Barrage on Ken River under Ken Betwa Link… — more information requested, 0 m away
- Sand/Morrum Mine — environmental approval granted, 4.5 km away
- Sand/Morrum Mine — cleared for impact study, 4.5 km away
- "Sand / Morrum Mining" from Riverbed of Ken River Village- Khaptiha Kalan,… — cleared for impact study, 5.2 km away
- Proposed Project "Sand/Morrum Mining" at Gata No. Part of 100 (Khand-1), Area-… — more information requested, 5.2 km away
- Transfer of EC Riverbed Sand/Morrum mining project on River Ken located at… — environmental approval granted, 5.4 km away
- Sand/Morrum Mining Project on Area- 39.52 Acre (16.0Ha) On Ken River For… — lapsed, 5.5 km away
- "Sand/Morrum Mining" at Gata No. Part of 100 (Khand No.-03), area- 16 Ha.,… — environmental approval granted, 5.7 km away
More from Executive Engineer Ken Betwa Link Canal Construction Division -1 Mahoba in Banda
3 Executive Engineer Ken, Uttar Pradesh projects in Banda
All 4 Executive Engineer Ken, Uttar Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.