What is this project?
Project for Construction of Pailani Barrage on Ken River under Ken Betwa Link Project is a lapsed water and irrigation project in Achhraund, Banda, Uttar Pradesh. The site covers 99,532.3 acres.
Who is building it?
The applicant is Executive Engineer Ken Betwa Link Canal Construction Division -1 Mahoba.
Has it been approved?
No. The application was lapsed on 9 Nov 2026, so it is no longer under consideration.
Where is it?
In Achhraund, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3,515.3 crore and a site of 99,532.3 acres.
When was it filed?
The application was filed on 9 Feb 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Nov 2026 |
| Application filed | 9 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Executive Engineer Ken Betwa Link Canal Construction Division -1 Mahoba |
| Land area | 99,532.3 acres (40,279.4 ha) |
| Project cost | ₹3,515.3 crore |
| Village / locality | Achhraund |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03885 |
Where it is
Achhraund, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Ken River… — environmental approval granted, 6.9 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Ken River… — cleared for impact study, 6.9 km away
- Sand/Morrum Mine from Riverbed of Ken River, Village- Sadikhadar, Gata No.-… — environmental approval granted, 7.1 km away
- Sand/Morrum Mine from Riverbed of Ken River, Village- Sadikhadar, Gata No.-… — cleared for impact study, 7.1 km away
- Sand/Morrum Mining on Ken Riverbed in Gata No. 60 — lapsed, 7.2 km away
- Sandi Khadar Sand/Morrum Mine — environmental approval granted, 7.2 km away
- Sandi Khadar Sand/Morrum Mine — cleared for impact study, 7.2 km away
- Sadi Khadar Sand/Morrum Mining Project, Located on river bed of Ken River… — under environmental review, 8.1 km away
More from Executive Engineer Ken Betwa Link Canal Construction Division -1 Mahoba in Banda
- Project for Construction of Pailani Barrage on Ken River under Ken Betwa Link… — more information requested
- Project for Construction of Pailani Barrage on Ken River under Ken Betwa Link… — returned to applicant
3 Executive Engineer Ken, Uttar Pradesh projects in Banda
All 4 Executive Engineer Ken, Uttar Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.