Environmental approval grantedMining · Banda, Uttar Pradesh

Proposed "Sand/ Morrum Mining" Project at Gata No.- 585/1, 857, 859/1, 914, 954, 1248/2, Village- Khalari, Tehsil- Naraini, District- Banda, U.P. (Applied Area : 6.648 ha.) Shri Sulabh Saxena S/o Late Shri Suraj Sahai Saxena

Proposed "Sand/ Morrum Mining" Project at Gata No.- 585/1, 857, 859/1, 914, 954, 1248/2, Village- Khalari, Tehsil- Naraini, District- Banda, U.P. (Applied Area : 6.648 ha.) Shri Sulabh Saxena S/o Late Shri Suraj Sahai Saxena is an approved mining project in Khalari, Naraini, Banda, Uttar Pradesh. The site covers 16.4 acres. Its stated project cost is ₹65 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 31 Jan 2026).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed "Sand/ Morrum Mining" Project at Gata No.- 585/1, 857, 859/1, 914, 954, 1248/2, Village- Khalari, Tehsil- Naraini, District- Banda, U.P. (Applied Area : 6.648 ha.) Shri Sulabh Saxena S/o Late Shri Suraj Sahai Saxena is an approved mining project in Khalari, Naraini, Banda, Uttar Pradesh. The site covers 16.4 acres.

Who is building it?

The applicant is Sulabh Saxena.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 31 Jan 2026), as of 27 Nov 2026.

Where is it?

In Khalari, Naraini, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹65 lakh and a site of 16.4 acres.

When was it filed?

The application was filed on 9 Apr 2025.

Project details

StatusEnvironmental approval granted
Status since31 Jan 2026
Application filed9 Apr 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSulabh Saxena
Land area16.4 acres (6.7 ha)
Project cost₹65 lakh
Village / localityKhalari
Taluk / tehsilNaraini
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02869

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 9 Apr 2025 (this page)Environmental approval granted16.4 acres₹65 lakh
Early planning filed 3 Oct 2024Cleared for impact study16.4 acres₹65 lakh

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 16.4 acres, this one is smaller than 79% of them.

No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.

Where it is

Khalari, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.