Quick answers
What is this project?
Proposed "Sand/ Morrum Mining" Project at Gata No.- 585/1, 857, 859/1, 914, 954, 1248/2, Village- Khalari, Tehsil- Naraini, District- Banda, U.P. (Applied Area : 6.648 ha.) Shri Sulabh Saxena S/o Late Shri Suraj Sahai Saxena is a proposed mining project in Khalari, Naraini, Banda, Uttar Pradesh. The site covers 16.4 acres.
Who is building it?
The applicant is Sulabh Saxena.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Dec 2024), as of 27 Nov 2026.
Where is it?
In Khalari, Naraini, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh and a site of 16.4 acres.
When was it filed?
The application was filed on 3 Oct 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed "Sand/ Morrum Mining" Project at Gata No.- 585/1, 857, 859/1, 914, 954, 1248/2,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 Dec 2024 |
| Application filed | 3 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sulabh Saxena |
| Land area | 16.4 acres (6.7 ha) |
| Project cost | ₹65 lakh |
| Village / locality | Khalari |
| Taluk / tehsil | Naraini |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02460 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Apr 2025 | Environmental approval granted | 16.4 acres | ₹65 lakh |
| Early planning filed 3 Oct 2024 (this page) | Cleared for impact study | 16.4 acres | ₹65 lakh |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 16.4 acres, this one is smaller than 79% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Khalari, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Sand/ Morrum Mining" Project at Gata No.- 585/1, 857, 859/1, 914,… — environmental approval granted, 0 m away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — in-principle approval, conditions pending, 2.5 km away
- Environmental clearance for sand/morrum mining from riverbed of Baghain, at… — environmental approval granted, 3.1 km away
- Sand/Moram Mining Project — returned to applicant, 3.1 km away
- "Sand/Morrum Mining" from Riverbed of Baghein River — environmental approval granted, 3.8 km away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Gata… — environmental approval granted, 3.8 km away
- "Gitti/ Patthar" Project at Gata No.- 587 (Khand No.- 06) , Village- Nahari,… — environmental approval granted, 4.3 km away
- "Gitti/ Patthar" Project at Gata No.- 587 (Khand No.- 06) , Village- Nahari,… — cleared for impact study, 4.3 km away
More from Sulabh Saxena in Banda
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Jarar, Gata No.- 851,… — environmental approval granted
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Jarar, Gata No.- 851,… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.