Cleared for impact studyMining · Jalaun, Uttar Pradesh

Proposed Project of "Sand/Morrum Mine" located at Gata No. 169/9 (Khand- 07), over an area of 15.00 Hectares

Proposed Project of "Sand/Morrum Mine" located at Gata No. 169/9 (Khand- 07), over an area of 15.00 Hectares is a proposed mining project in Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh. The site covers 37.1 acres. Its stated project cost is ₹45 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 31 Jan 2026).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of "Sand/Morrum Mine" located at Gata No. 169/9 (Khand- 07), over an area of 15.00 Hectares is a proposed mining project in Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh. The site covers 37.1 acres.

Who is building it?

The applicant is Silvrr Mist Retail Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 31 Jan 2026), as of 27 Nov 2026.

Where is it?

In Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹45 lakh and a site of 37.1 acres.

When was it filed?

The application was filed on 4 Oct 2025.

Project details

Official titleProposed Project of "Sand/Morrum Mine" located at Gata No. 169/9 (Khand- 07), over an area of 15.00 Hectares situated in Village – Hirapur Divara, Tehsil – Kalpi & District - Jalaun (U.P.).Director- Shri Prashant Kumar Malviya.
StatusCleared for impact study
Status since31 Jan 2026
Application filed4 Oct 2025
Approval soughtEnvironmental approval
Application typeAmendment
SectorMining
ApplicantSilvrr Mist Retail Private Limited
Land area37.1 acres (15 ha)
Project cost₹45 lakh
Village / localityHirapur Divara
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite area on record
Our referenceWID-UP-03340

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 4 Oct 2025 (this page)Cleared for impact study37.1 acres₹45 lakh
Early planning filed 7 Feb 2025Cleared for impact study37.1 acres₹45 lakh

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 37.1 acres, this one is smaller than 66% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 74.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.

Where it is

Hirapur Divara, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Silvrr Mist Retail projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.