What is this project?
Proposed Diversion for Laying of Water Distribution Line along Gursarai-Erach Road, from Km. No. 32.000 to Km. No. 34.400 (LHS), under Sala Group of Villages Drinking Water Scheme of Jal Jeevan Mission of Govt. of India is a proposed pipeline project in Dhikauli, Garautha, Jhansi, Uttar Pradesh. The site covers 5.8 acres.
Who is building it?
The applicant is Uttar Pradesh Water Supply and Sanitation Mission.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Dhikauli, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹512.7 crore; a site of 5.8 acres and 1.2 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 22 Feb 2023.
Project details
| Official title | Proposed Diversion for Laying of Water Distribution Line along Gursarai-Erach Road, from Km. No. 32.000 to Km. No. 34.400 (LHS), under Sala Group of Villages Drinking Water Scheme of Jal Jeevan Mission of Govt. of India, in District:-Jhansi. |
|---|---|
| Status | More information requested |
| Status since | 12 May 2026 |
| Application filed | 22 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Uttar Pradesh Water Supply and Sanitation Mission |
| Land area | 5.8 acres (2.4 ha) |
| Forest land | 1.2 acres (0.5 ha) |
| Project cost | ₹512.7 crore |
| Village / locality | Dhikauli |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07261 |
In context
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhikauli, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be diverted for Construction of Link Road — in-principle approval, conditions pending, 2.2 km away
- Sand/Moram Mining Project at Betwa River Bed, Gata No. 2118, 2119, Khand No.… — lapsed, 3.2 km away
- Proposed Forest Land to be diverted for Entry/Exit approach to IOCL Retail… — lapsed, 3.5 km away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Arazi… — lapsed, 3.6 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — lapsed, 3.6 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — cleared for impact study, 3.6 km away
- Proposed project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — cleared for impact study, 3.7 km away
- "Up Defence Industrial Corridor" — environmental approval granted, 3.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.