Quick answers
What is this project?
Proposed Integrated Steel Plant: Sponge Iron (2,31,000 TPA), Steel Melting Shop (2,47,500 TPA), Rolling Mill (2,47,500 TPA), Power Plant- 35 MW (20 MW through Waste Heat Recovery Boiler (WHRB) and 15 MW through FBC Boiler) by M/s. Earthstar Ventures Private Limited is a lapsed industrial project in Dhauhan, Chunar, Mirzapur, Uttar Pradesh. The site covers 143.1 acres.
Who is building it?
The applicant is Earthstar Ventures Private Limited.
Has it been approved?
No. The application was lapsed on 29 Aug 2025, so it is no longer under consideration.
Where is it?
In Dhauhan, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹538 crore and a site of 143.1 acres.
When was it filed?
The application was filed on 25 Jul 2025.
Project details
| Official title | Proposed Integrated Steel Plant: Sponge Iron (2,31,000 TPA), Steel Melting Shop (2,47,500 TPA), Rolling Mill (2,47,500 TPA), Power Plant- 35 MW (20 MW through Waste Heat Recovery Boiler (WHRB) and 15 MW through FBC Boiler) At Village Dhauha, Tehsil Chunar, District Mirzapur, Uttar Pradesh by M/s. Earthstar Ventures Private Limited |
|---|---|
| Status | Lapsed |
| Status since | 29 Aug 2025 |
| Application filed | 25 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Earthstar Ventures Private Limited |
| Land area | 143.1 acres (57.9 ha) |
| Project cost | ₹538 crore |
| Village / locality | Dhauhan |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03418 |
In context
16 applications in Mirzapur since January 2022 are in the same category (Industry): 9 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 143.1 acres, this one is larger than 94% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhauhan, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Terms of Reference Application for Expansion of Existing Unit From 96mt/Day to… — environmental approval granted, 850 m away
- Terms of Reference Application for Expansion of Existing Unit From 96mt/Day to… — cleared for impact study, 850 m away
- Proposed Expansion of Existing Unit From 96 TPD To 700 TPD MS Billets Through… — more information requested, 1000 m away
- Transfer of Environmental Clearance for "Cement Grinding Unit" at Araji… — environmental approval granted, 1.6 km away
- Laying of Underground Optical Fibre Cable — lapsed, 2.9 km away
- Proposed Expansion of Cement Production Clinker Grinding Unit Capacity From… — initial checks, 3 km away
- Expansion of existing unit from 70mt/day to 280mt/day having production of… — environmental approval granted, 4.7 km away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — environmental approval granted, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.