What is Developing? Open the mapMap

Cleared for impact studyMining · Saharanpur, Uttar Pradesh

"Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River

"Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River is a proposed mining project in Abbu Talibpur Garh, Behat, Saharanpur, Uttar Pradesh. The site covers 91.4 acres. Its stated project cost is ₹3.4 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Jan 2026).

See it on the live map All projects in Saharanpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River is a proposed mining project in Abbu Talibpur Garh, Behat, Saharanpur, Uttar Pradesh. The site covers 91.4 acres.

Who is building it?

The applicant is Khudrung Developers Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Jan 2026), as of 27 Nov 2026.

Where is it?

In Abbu Talibpur Garh, Behat, Saharanpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹3.4 crore and a site of 91.4 acres.

When was it filed?

The application was filed on 18 Sept 2025.

Project details

Official title"Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River at Village- Abutalibpur Garh Aehatmal, Gata No.- 1, Lease Area- 37.00 Ha., Tehsil- Behat, District- Saharanpur, Uttar Pradesh, Project Proponent- M/s Khudrung Developers Private Limited (Authorized Partner- Raj Kumar Sharma)
StatusCleared for impact study
Status since17 Jan 2026
Application filed18 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantKhudrung Developers Private Limited
Land area91.4 acres (37 ha)
Project cost₹3.4 crore
Village / localityAbbu Talibpur Garh
Taluk / tehsilBehat
DistrictSaharanpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03455

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 23 May 2026Lapsed91.4 acres₹3.4 crore
Early planning filed 18 Sept 2025 (this page)Cleared for impact study91.4 acres₹3.4 crore

In context

43 applications in Saharanpur since January 2022 are in the same category (Mining): 34 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 91.4 acres, this one is larger than 91% of them.

No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.

Where it is

Abbu Talibpur Garh, Behat, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.