Quick answers
What is this project?
"Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River is a lapsed mining project in Abbu Talibpur Garh, Behat, Saharanpur, Uttar Pradesh. The site covers 91.4 acres.
Who is building it?
The applicant is Khudrung Developers Private Limited.
Has it been approved?
No. The application was lapsed on 29 Sept 2026, so it is no longer under consideration.
Where is it?
In Abbu Talibpur Garh, Behat, Saharanpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3.4 crore and a site of 91.4 acres.
When was it filed?
The application was filed on 23 May 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River
Project details
| Official title | "Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River at Village- Abutalibpur Garh Aehatmal, Gata No.- 1, Lease Area- 37.00 Ha., Tehsil- Behat, District- Saharanpur, Uttar Pradesh, Project Proponent- M/s Khudrung Developers Private Limited (Authorized Partner- Raj Kumar Sharma) |
|---|---|
| Status | Lapsed |
| Status since | 29 Sept 2026 |
| Application filed | 23 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Khudrung Developers Private Limited |
| Land area | 91.4 acres (37 ha) |
| Project cost | ₹3.4 crore |
| Village / locality | Abbu Talibpur Garh |
| Taluk / tehsil | Behat |
| District | Saharanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04407 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 May 2026 (this page) | Lapsed | 91.4 acres | ₹3.4 crore |
| Early planning filed 18 Sept 2025 | Cleared for impact study | 91.4 acres | ₹3.4 crore |
In context
43 applications in Saharanpur since January 2022 are in the same category (Mining): 34 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 91.4 acres, this one is larger than 91% of them.
No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.
Where it is
Abbu Talibpur Garh, Behat, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River — cleared for impact study, 0 m away
- Proposed Project of "Sand/ Bajri/ Boulder Excavation (RBM) Mining Project" at… — under environmental review, 750 m away
- "Sand/ Bajri/ Boulder Excavation (RBM) Mining Project" — environmental approval granted, 750 m away
- "Sand/ Bajri/ Boulder Excavation (RBM) Mining Project" — cleared for impact study, 750 m away
- Proposed "Sand/Bajri/Boulder (RBM)" Mining Project at Gata No. 1, Area- 36.00… — more information requested, 1.3 km away
- "Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River — more information requested, 1.4 km away
- "Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River — cleared for impact study, 1.4 km away
- Proposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 व 1, (Total… — environmental approval granted, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.