What is Developing? Open the mapMap

LapsedMining · Saharanpur, Uttar Pradesh

"Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River

"Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River is a lapsed mining project in Abbu Talibpur Garh, Behat, Saharanpur, Uttar Pradesh. The site covers 91.4 acres. Its stated project cost is ₹3.4 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Sept 2026).

See it on the live map All projects in Saharanpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River is a lapsed mining project in Abbu Talibpur Garh, Behat, Saharanpur, Uttar Pradesh. The site covers 91.4 acres.

Who is building it?

The applicant is Khudrung Developers Private Limited.

Has it been approved?

No. The application was lapsed on 29 Sept 2026, so it is no longer under consideration.

Where is it?

In Abbu Talibpur Garh, Behat, Saharanpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹3.4 crore and a site of 91.4 acres.

When was it filed?

The application was filed on 23 May 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River

Project details

Official title"Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River at Village- Abutalibpur Garh Aehatmal, Gata No.- 1, Lease Area- 37.00 Ha., Tehsil- Behat, District- Saharanpur, Uttar Pradesh, Project Proponent- M/s Khudrung Developers Private Limited (Authorized Partner- Raj Kumar Sharma)
StatusLapsed
Status since29 Sept 2026
Application filed23 May 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantKhudrung Developers Private Limited
Land area91.4 acres (37 ha)
Project cost₹3.4 crore
Village / localityAbbu Talibpur Garh
Taluk / tehsilBehat
DistrictSaharanpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04407

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 23 May 2026 (this page)Lapsed91.4 acres₹3.4 crore
Early planning filed 18 Sept 2025Cleared for impact study91.4 acres₹3.4 crore

In context

43 applications in Saharanpur since January 2022 are in the same category (Mining): 34 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 91.4 acres, this one is larger than 91% of them.

No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.

Where it is

Abbu Talibpur Garh, Behat, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.