Quick answers
What is "Sand/Morrum Mining" from Riverbed of Yamuna River?
"Sand/Morrum Mining" from Riverbed of Yamuna River is a proposed mining project in Sadi Madanpur, Banda, Uttar Pradesh. The site covers 18.4 acres.
Who is building it?
The applicant is Shri Anand Kumar Gupta.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 28 May 2025), as of 27 Nov 2026.
Where is it?
In Sadi Madanpur, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3.3 crore and a site of 18.4 acres.
When was it filed?
The application was filed on 16 Apr 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Yamuna River
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Yamuna River at Village- Sadimadanpur, Gata No. – 92/6, 92/7 व 94, Lease Area– 7.46 ha. (18.43 Acre), Tehsil- Pailani, District- Banda, Uttar Pradesh, Project Proponent- Shri Anand Kumar Gupta |
|---|---|
| Status | Cleared for impact study |
| Status since | 28 May 2025 |
| Application filed | 16 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shri Anand Kumar Gupta |
| Land area | 18.4 acres (7.5 ha) |
| Project cost | ₹3.3 crore |
| Village / locality | Sadi Madanpur |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03523 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Oct 2025 | Environmental approval granted | 18.4 acres | ₹3.3 crore |
| Early planning filed 16 Apr 2025 (this page) | Cleared for impact study | 18.4 acres | ₹3.3 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 18.4 acres, this one is smaller than 75% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Sadi Madanpur, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 0 m away
- Sand/Morrum Mine from Riverbed of Yamuna River — lapsed, 1 km away
- Riverbed Sand Mine from Yamuna River, Village- Sadimadanpur, (Gata No.- Part… — returned to applicant, 1.5 km away
- Riverbed Sand Mine from Yamuna River, Village- Sadimadanpur, (Gata No.- Part… — environmental approval granted, 1.5 km away
- Riverbed Sand Mine from Yamuna River, Village- Sadimadanpur, (Gata No.- Part… — cleared for impact study, 1.5 km away
- Sand/morrum Mine from Riverbed of Yamuna River, Village- Sadimadanpur, (Gata… — more information requested, 2 km away
- Sand/morrum Mine from Riverbed of Yamuna River, Village- Sadimadanpur, (Gata… — cleared for impact study, 2 km away
- Sand/Morrum Mining project — lapsed, 2.3 km away
More from Shri Anand Kumar Gupta in Banda
- Sand/Morrum Mine from Riverbed of Ken River, Village- Marauli Khadar, Gata… — environmental approval granted
- Sand/Morrum Mine from Riverbed of Baghein River — environmental approval granted
- Sand/Morrum Mine from Riverbed of Ken River, Village- Marauli Khadar, Gata… — cleared for impact study
- Sand/Morrum Mine from Riverbed of Yamuna River — lapsed
- Sand/Morrum Mine from Riverbed of Baghein River — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.