Quick answers
What is this project?
Sand/Morrum Mine from Riverbed of Ken River, Village- Marauli Khadar, Gata No.- 332/17, part of 333/7 & 431/333/1 (Khand No.- 06), lease area- 23.00 Ha., Tehsil- Banda, District- Banda, Uttar Pradesh, Project Proponent- M/s Anandeshwar Chemtech Pvt. Ltd. (Director- Shri Anand Kumar Gupta) is a proposed mining project in Marauli Khadar, Banda, Uttar Pradesh. The site covers 56.8 acres.
Who is building it?
The applicant is Shri Anand Kumar Gupta.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 Apr 2025), as of 27 Nov 2026.
Where is it?
In Marauli Khadar, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 56.8 acres.
When was it filed?
The application was filed on 29 Oct 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand/Morrum Mine from Riverbed of Ken River, Village- Marauli Khadar, Gata No.- 332/17,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 Apr 2025 |
| Application filed | 29 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shri Anand Kumar Gupta |
| Land area | 56.8 acres (23 ha) |
| Project cost | ₹1 crore |
| Village / locality | Marauli Khadar |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01559 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Oct 2025 | Environmental approval granted | 56.8 acres | ₹1 crore |
| Early planning filed 29 Oct 2024 (this page) | Cleared for impact study | 56.8 acres | ₹1 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 56.8 acres, this one is larger than 83% of them.
No other mining lease on record is within 500 m of this site; 10 have applied within 5 km.
Where it is
Marauli Khadar, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mine from Riverbed of Ken River, Village- Marauli Khadar, Gata… — environmental approval granted, 0 m away
- Mining project by M/s Descon Buildtech Pvt Ltd — environmental approval granted, 700 m away
- Sand/Morrum Mine in Village – Maraulikhader , Tehsil- Banda, District- Banda… — environmental approval granted, 950 m away
- Sand/Morrum Mine in Village – Maraulikhader , Tehsil- Banda, District- Banda… — cleared for impact study, 1000 m away
- Rivedbed Sand/Morrum Mining from Ken Riverbed in Gata No. 333/7 part, 418,… — lapsed, 1.1 km away
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata… — under environmental review, 1.1 km away
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata… — cleared for impact study, 1.1 km away
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Marauli khadar, Gata… — under environmental review, 1.2 km away
More from Shri Anand Kumar Gupta in Banda
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study
- Sand/Morrum Mine from Riverbed of Baghein River — environmental approval granted
- Sand/Morrum Mine from Riverbed of Yamuna River — lapsed
- Sand/Morrum Mine from Riverbed of Baghein River — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.