Quick answers
What is this project?
Proposed "Ordinary Sand Category- I Mining" Project at Gata No.- 2534, Village- Hariha, Tehsil- Shikohabad, District- Firozabad, U.P. (Applied Area : 5.8700 ha.), M/s Surendra Singh Yadav Contractor, Prop.- Shri Surendra Singh Yadav S/o Shri Bhagwan Singh is a proposed mining project in Hariha, Shikohabad, Firozabad, Uttar Pradesh. The site covers 14.5 acres.
Who is building it?
The applicant is Surendra Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 26 Dec 2025), as of 27 Nov 2026.
Where is it?
In Hariha, Shikohabad, Firozabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹52 lakh and a site of 14.5 acres.
When was it filed?
The application was filed on 8 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed "Ordinary Sand Category- I Mining" Project at Gata No.- 2534, Village- Hariha,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 26 Dec 2025 |
| Application filed | 8 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Surendra Singh |
| Land area | 14.5 acres (5.9 ha) |
| Project cost | ₹52 lakh |
| Village / locality | Hariha |
| Taluk / tehsil | Shikohabad |
| District | Firozabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03543 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Jul 2026 | Environmental approval granted | 14.5 acres | ₹52 lakh |
| Early planning filed 8 Sept 2025 (this page) | Cleared for impact study | 14.5 acres | ₹52 lakh |
In context
10 applications in Firozabad since January 2022 are in the same category (Mining): 8 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 14.5 acres, this one is larger than 60% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Hariha, Shikohabad, Firozabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Ordinary Sand Category- I Mining" Project at Gata No.- 2534,… — environmental approval granted, 0 m away
- "Ordinary Soil Mining" Project at Gata No.- 571, Village- Pharaul Nagaria,… — initial checks, 5.1 km away
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC) - Firozabad — under environmental review, 9.4 km away
- The Diversion of Road Side Protected Forest for Laying Water Supply Pipeline… — lapsed, 10.3 km away
- Proposed "Ordinary Sand Category- I" Project at Gata No.- 1055/3, Village-… — environmental approval granted, 15.8 km away
- Proposed "Ordinary Sand Category- I" Project at Gata No.- 1055/3, Village-… — cleared for impact study, 15.8 km away
- Proposed Forest Land To Be Diverted For Laying Of Optical Fiber Cable By M/S… — lapsed, 17.6 km away
- Diversion of Forest Land for the Construction of 400 KV D/C Ghiror-Firozabad… — in-principle approval, conditions pending, 17.7 km away