Quick answers
What is this project?
Proposed Integrated Manufacturing & Logistic Cluster (IMLC) - Firozabad is a proposed industrial project in Alabalpur, Shikohabad, Firozabad, Uttar Pradesh. The site covers 354.1 acres.
Who is building it?
The applicant is Uttar Pradesh Expressways Industrial Development Authority (Upeida).
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Alabalpur, Shikohabad, Firozabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹336.5 crore and a site of 354.1 acres.
When was it filed?
The application was filed on 23 Apr 2026.
Project details
| Official title | Proposed Integrated Manufacturing & Logistic Cluster (IMLC) - Firozabad at Village - Nasirpur, Tehsil - Shikohabad and Villages - Gospur, Salempur Chak and Ababakarpur, Tehsil - Sirsaganj, District - Firozabad, State - Uttar Pradesh by Uttar Pradesh Expressways Industrial Development Authority (UPEIDA). |
|---|---|
| Status | Under environmental review |
| Status since | 7 Aug 2026 |
| Application filed | 23 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Uttar Pradesh Expressways Industrial Development Authority (Upeida) |
| Land area | 354.1 acres (143.3 ha) |
| Project cost | ₹336.5 crore |
| Village / locality | Alabalpur |
| Taluk / tehsil | Shikohabad |
| District | Firozabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04330 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Alabalpur, Shikohabad, Firozabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Diversion of Road Side Protected Forest for Laying Water Supply Pipeline… — lapsed, 1 km away
- Proposed Forest Land To Be Diverted For Laying Of Optical Fiber Cable By M/S… — lapsed, 8.5 km away
- Proposed "Ordinary Sand Category- I Mining" Project at Gata No.- 2534,… — environmental approval granted, 9.4 km away
- Proposed "Ordinary Sand Category- I Mining" Project at Gata No.- 2534,… — cleared for impact study, 9.4 km away
- "Ordinary Soil Mining" Project at Gata No.- 571, Village- Pharaul Nagaria,… — initial checks, 10.2 km away
- Amended BharatNet Project (Shikohabad-Firozabad) — lapsed, 13.9 km away
- Diversion of 0.0110 Hectare of protected Forest land Under Social Forestry… — forest land use approved, 14.1 km away
- • Proposal for the Diversion of Road Side Protected Forest for Laying Water… — lapsed, 14.3 km away
All 39 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.