Quick answers
What is Ordinary Soil Mining Project?
Ordinary Soil Mining Project is an approved mining project in Sekhupur Guzar, Amroha, Uttar Pradesh. The site covers 8.3 acres.
Who is building it?
The applicant is Sangeeta Devi.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Mar 2026), as of 27 Nov 2026.
Where is it?
In Sekhupur Guzar, Amroha, Uttar Pradesh.
How big is it?
It has a stated cost of ₹23 lakh and a site of 8.3 acres.
When was it filed?
The application was filed on 3 Nov 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Mar 2026 |
| Application filed | 3 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sangeeta Devi |
| Land area | 8.3 acres (3.4 ha) |
| Project cost | ₹23 lakh |
| Village / locality | Sekhupur Guzar |
| Taluk / tehsil | Amroha |
| District | Amroha |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03669 |
In context
38 applications in Amroha since January 2022 are in the same category (Mining): 27 approved, 11 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 8.3 acres, this one is larger than 89% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Sekhupur Guzar, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Soil Mine — under environmental review, 900 m away
- Ordinary Soil Mine — under environmental review, 1.5 km away
- Proposed IOCL Retail Outlet at Delhi-Moradabad Road NH-09 (Old NH-24) KM-134… — lapsed, 3.6 km away
- Granting of permission for Construction of Access to the Proposed CNG Station… — forest land use approved, 3.6 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 4.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 4.3 km away
- Proposed Protected Forest Land to be diverted for Construction of… — forest land use approved, 4.5 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.