What is Developing? Open the mapMap

LapsedFuel stations · Amroha, Uttar Pradesh

Proposed IOCL Retail Outlet at Delhi-Moradabad Road NH-09 (Old NH-24) KM-134 (Ch. 133.627 to Ch.133.666,RHS) Khasra/Gata no. 514MI , Village - Didauli, Tehsil & District Amroha

Proposed IOCL Retail Outlet at Delhi-Moradabad Road NH-09 (Old NH-24) KM-134 (Ch. 133.627 to Ch.133.666,RHS) Khasra/Gata no. 514MI , Village - Didauli, Tehsil & District Amroha is a lapsed fuel station in Didauli, Amroha, Uttar Pradesh. The site covers 1.2 acres. Its stated project cost is ₹65 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 19 Mar 2025).

See it on the live map All projects in Amroha

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed IOCL Retail Outlet at Delhi-Moradabad Road NH-09 (Old NH-24) KM-134 (Ch. 133.627 to Ch.133.666,RHS) Khasra/Gata no. 514MI , Village - Didauli, Tehsil & District Amroha is a lapsed fuel station in Didauli, Amroha, Uttar Pradesh. The site covers 1.2 acres.

Who is building it?

The applicant is Indian Oil Corporation Limited (IOCL).

Has it been approved?

No. The application was lapsed on 19 Mar 2025, so it is no longer under consideration.

Where is it?

In Didauli, Amroha, Uttar Pradesh.

How big is it?

It has a stated cost of ₹65 lakh; a site of 1.2 acres and 3,390 m² of forest land.

When was it filed?

The application was filed on 17 Nov 2024.

Project details

StatusLapsed
Status since19 Mar 2025
Application filed17 Nov 2024
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantIndian Oil Corporation Limited (IOCL)
Land area1.2 acres (0.5 ha)
Forest land3,390 m²
Project cost₹65 lakh
Village / localityDidauli
Taluk / tehsilAmroha
DistrictAmroha
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06449

In context

30 applications in Amroha since January 2022 are in the same category (Fuel stations): 20 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 1.2 acres, this one is larger than 87% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Didauli, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indian Oil Corporation Limited (IOCL) in Amroha

14 Indian Oil Corporation (IOCL) projects in Amroha
All 822 Indian Oil Corporation (IOCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.