Quick answers
What is this project?
Ordinary Soil Excavation Project at Gata Nos. 1372 (Total Area – 1.948 Ha.) Village – Bandhauli, Tehsil- Orai District- Jalaun (U.P.), M/s LC Infra Projects Private Limited, Proponent: Shri Shyamsundar Rameshwar ji is an approved mining project in Bindhauli, Orai, Jalaun, Uttar Pradesh. The site covers 4.8 acres.
Who is building it?
The applicant is Shyamsunder Agrawal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Jun 2025), as of 27 Nov 2026.
Where is it?
In Bindhauli, Orai, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 4.8 acres.
When was it filed?
The application was filed on 8 May 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Jun 2025 |
| Application filed | 8 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shyamsunder Agrawal |
| Land area | 4.8 acres (2 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Bindhauli |
| Taluk / tehsil | Orai |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03754 |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.8 acres, this one is smaller than 97% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Bindhauli, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Sand/Morrum Mining Project having lease area- 20.20 ha along River… — environmental approval granted, 3.4 km away
- Riverbed Sand/Morrum Mining Project having lease area- 20.20 ha along River… — cleared for impact study, 3.4 km away
- Proposed reserved forest Land to be diverted for Construction of Approach Road… — lapsed, 3.6 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 3.8 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 3.8 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — lapsed, 3.9 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study, 3.9 km away
- Proposed Riverbed Sand/Morrum mining Area- 20.242 Ha Sand/Morrum Mining… — under environmental review, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.