Under environmental reviewMining · Jalaun, Uttar Pradesh

Proposed Riverbed Sand/Morrum mining Area- 20.242 Ha Sand/Morrum Mining Project at Gata No- 1482, Khand No.- 02, Village- Tikar, Tehsil- Orai, District- Jalaun, U.P.

Proposed Riverbed Sand/Morrum mining Area- 20.242 Ha Sand/Morrum Mining Project at Gata No- 1482, Khand No.- 02, Village- Tikar, Tehsil- Orai, District- Jalaun, U.P is a proposed mining project in Tikar, Orai, Jalaun, Uttar Pradesh. The site covers 50 acres. Its stated project cost is ₹6 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 21 Sept 2026).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Riverbed Sand/Morrum mining Area- 20.242 Ha Sand/Morrum Mining Project at Gata No- 1482, Khand No.- 02, Village- Tikar, Tehsil- Orai, District- Jalaun, U.P is a proposed mining project in Tikar, Orai, Jalaun, Uttar Pradesh. The site covers 50 acres.

Who is building it?

The applicant is Abhay Singh.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Tikar, Orai, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹6 crore and a site of 50 acres.

When was it filed?

The application was filed on 30 Mar 2026.

Project details

StatusUnder environmental review
Status since21 Sept 2026
Application filed30 Mar 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAbhay Singh
Land area50 acres (20.2 ha)
Project cost₹6 crore
Village / localityTikar
Taluk / tehsilOrai
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03978

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 50 acres, this one is larger than 69% of them.

No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.

Where it is

Tikar, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.