What is Developing? Open the mapMap

Cleared for impact studyMining · Kanpur Nagar, Uttar Pradesh

"Morrum Mining" from Riverbed of Yamuna River

"Morrum Mining" from Riverbed of Yamuna River is a proposed mining project in Samuhi, Ghatampur, Kanpur Nagar, Uttar Pradesh. The site covers 68 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 31 Dec 2025).

See it on the live map All projects in Kanpur Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Morrum Mining" from Riverbed of Yamuna River?

"Morrum Mining" from Riverbed of Yamuna River is a proposed mining project in Samuhi, Ghatampur, Kanpur Nagar, Uttar Pradesh. The site covers 68 acres.

Who is building it?

The applicant is Anita Sharma.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 31 Dec 2025), as of 27 Nov 2026.

Where is it?

In Samuhi, Ghatampur, Kanpur Nagar, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.5 crore and a site of 68 acres.

When was it filed?

The application was filed on 16 Sept 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Morrum Mining" from Riverbed of Yamuna River

Project details

Official title"Morrum Mining" from Riverbed of Yamuna River at Village- Samuhi, Gata No.- 1598 Ch, Lease Area- 27.50 ha., Tehsil- Ghatampur, District- Kanpur Nagar, Uttar Pradesh, Project Proponent- M/s A. R. Construction (Prop. - Anita Sharma)
StatusCleared for impact study
Status since31 Dec 2025
Application filed16 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAnita Sharma
Land area68 acres (27.5 ha)
Project cost₹1.5 crore
Village / localitySamuhi
Taluk / tehsilGhatampur
DistrictKanpur Nagar
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03819

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 14 May 2026Environmental approval granted68 acres₹1.5 crore
Early planning filed 16 Sept 2025 (this page)Cleared for impact study68 acres₹1.5 crore

In context

10 applications in Kanpur Nagar since January 2022 are in the same category (Mining): 10 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 68 acres, this one is larger than 80% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Samuhi, Ghatampur, Kanpur Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.