Quick answers
What is this project?
"Ordinary Soil Mining" Project at Gata No.- 88, 91, Village-Guddasaur, Tehsil-Mat, District- Mathura, Uttar Pradesh. (Area-2.7072 Ha). Shri Dharam Veer is a proposed mining project in Guddarsaur, Mat, Mathura, Uttar Pradesh. The site covers 6.7 acres.
Who is building it?
The applicant is Dharamveer.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Guddarsaur, Mat, Mathura, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.8 crore and a site of 6.7 acres.
When was it filed?
The application was filed on 22 Oct 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 24 Oct 2026 |
| Application filed | 22 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dharamveer |
| Land area | 6.7 acres (2.7 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Guddarsaur |
| Taluk / tehsil | Mat |
| District | Mathura |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04953 |
In context
28 applications in Mathura since January 2022 are in the same category (Mining): 10 approved, 18 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6.7 acres, this one is larger than 64% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 13.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Guddarsaur, Mat, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Mining" Project at Gata No.- 53, 69, Village- Guddarsaur,… — environmental approval granted, 250 m away
- "Ordinary Soil Mining" Project at Gata No.- 2477मि0, Village- Arruwa Banger,… — under environmental review, 2.9 km away
- Forest Land Proposed for diversion from Vrindavan Gate near Pagal Baba Mandir… — forest land use approved, 5.4 km away
- Diversion of protected forest land for Construction of 604.525 m long Two-lane… — in-principle approval, conditions pending, 6 km away
- Diversion of protected forest land for Construction of 604.525 m long Two-lane… — lapsed, 6 km away
- New Entry Gate near Laxmi Nagar Crossing at Km. Chainage 83+600 of… — more information requested, 6.3 km away
- Proposed "Commercial Rukmani Vihar Avasiya Yojna" project at Plot no. S-3,… — lapsed, 7.6 km away
- Proposed "Commercial Rukmani Vihar Avasiya Yojna" project at Plot no. S-3,… — environmental approval granted, 7.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.