Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Ghaghara River at Village- Madraha, Gata No.- 158Ada, Lease Area- 15.00 Ha., Tehsil- Gola, District- Gorakhpur, Uttar Pradesh, Project Proponent- Shri Sanjay Kumar Maddeshiya S/o Late Shivnath Prasad |
|---|---|
| Status | Under environmental review |
| Status since | 27 Oct 2026 |
| Application filed | 8 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sanjay Kumar Maddeshiya |
| Land area | 37.1 acres (15 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Madraha |
| Taluk / tehsil | Gola |
| District | Gorakhpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04085 |
In context
13 applications in Gorakhpur since January 2022 are in the same category (Mining): 6 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. At 37.1 acres, this one is larger than 92% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Madraha, Gola, Gorakhpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Ordinary Sand Mining project from the riverbed of Ghaghara river at… — initial checks, 11.2 km away
- Proposed Ordinary Sand Mining project from the riverbed of Ghaghara river at… — under environmental review, 11.2 km away
- Riverbed Sand Mining on the riverbed of Ghaghara River at Gata No. 62 Gha,… — under environmental review, 13.8 km away
- "Riverbed Ordinary Sand mining" from Riverbed of Ghaghara River located at… — environmental approval granted, 14 km away
- "Riverbed Ordinary Sand mining" from Riverbed of Ghaghara River located at… — cleared for impact study, 14 km away
- PROPOSED GRAIN BASED ETHANOL DISTILLERY CAPACITY – 750 KLD AND MALT BASED… — environmental approval granted, 20.8 km away
- PROPOSED GRAIN BASED ETHANOL DISTILLERY CAPACITY – 750 KLD AND MALT BASED… — cleared for impact study, 20.8 km away
- Proposed Standalone Cement Grinding unit with Cement Production Capacity of 2… — cleared for impact study, 21.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.