Quick answers
What is Sand/Morrum Mining From Betwa Riverbed?
Sand/Morrum Mining From Betwa Riverbed is a proposed mining project in Shamsherpur, Tahrauli, Jhansi, Uttar Pradesh. The site covers 30 acres.
Who is building it?
The applicant is Prime Earth Infra.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Shamsherpur, Tahrauli, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹5.4 crore and a site of 30 acres.
When was it filed?
The application was filed on 24 Oct 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 24 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Prime Earth Infra |
| Land area | 30 acres (12.1 ha) |
| Project cost | ₹5.4 crore |
| Village / locality | Shamsherpur |
| Taluk / tehsil | Tahrauli |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04089 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30 acres, this one is larger than 78% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Shamsherpur, Tahrauli, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mining from Betwa River Bed Mining Project — cleared for impact study, 850 m away
- Teharka Sand/Morrum Mining Project — environmental approval granted, 850 m away
- Teharka Sand/Morrum Mining Project — cleared for impact study, 850 m away
- Proposed Forest Land to be diverted for construction of River Bridge — forest land use approved, 2.8 km away
- Proposed Reserved Forest Land to be diverted for construction of Betwa River… — lapsed, 2.9 km away
- Jhansi Link Expressway (From Bundelkhand Expressway to BIDA Connecting Jhansi… — more information requested, 5 km away
- Proposed River Bed Sand/ Morrum Mining from Betwa River Bed at Araji No. 321 ,… — under environmental review, 5.5 km away
- Proposed River Bed Sand/ Morrum Mining from Betwa River Bed at Araji No. 321 ,… — cleared for impact study, 5.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.