Quick answers
What is this project?
Proposed Forest Land to be diverted for construction of River Bridge is an approved road project in Khiria Ghat, Moth, Jhansi, Uttar Pradesh. The site covers 5.2 acres.
Who is building it?
The applicant is Bridge Corporation Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 16 Apr 2026), as of 27 Nov 2026.
Where is it?
In Khiria Ghat, Moth, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹93.6 crore; a site of 5.2 acres and 2.3 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 19 Mar 2025.
Project details
| Official title | Proposed Forest Land to be diverted for construction of River Bridge in District: Jhansi. |
|---|---|
| Status | Forest land use approved |
| Status since | 16 Apr 2026 |
| Application filed | 19 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bridge Corporation Limited |
| Land area | 5.2 acres (2.1 ha) |
| Forest land | 2.3 acres (0.9 ha) |
| Project cost | ₹93.6 crore |
| Village / locality | Khiria Ghat |
| Taluk / tehsil | Moth |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06837 |
In context
12 applications in Jhansi since January 2022 are in the same category (Roads & highways): 1 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. At 5.2 acres, this one is smaller than 55% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khiria Ghat, Moth, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Reserved Forest Land to be diverted for construction of Betwa River… — lapsed, 400 m away
- Sand/Morrum Mining From Betwa Riverbed — under environmental review, 2.8 km away
- Proposed River Bed Sand/ Morrum Mining from Betwa River Bed at Araji No. 321 ,… — under environmental review, 3.1 km away
- Proposed River Bed Sand/ Morrum Mining from Betwa River Bed at Araji No. 321 ,… — cleared for impact study, 3.1 km away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Arazi… — environmental approval granted, 3.5 km away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Arazi… — environmental approval granted, 3.5 km away
- Teharka Sand/Morrum Mining Project — environmental approval granted, 3.6 km away
- Sand/Morrum Mining from Betwa River Bed Mining Project — cleared for impact study, 3.6 km away
More from Bridge Corporation Limited in Jhansi
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — in-principle approval, conditions pending
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — lapsed
- Proposed Reserved Forest Land to be diverted for construction of Betwa River… — lapsed
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — in-principle approval, conditions pending
All 5 Bridge Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.