Quick answers
What is this project?
Proposed Reserved Forest Land to be diverted for construction of Betwa River Bridge & Approach Road at Khiriya Ghat of Moth-Baghera Road is a lapsed road project in Deora Saran, Tahrauli, Jhansi, Uttar Pradesh. The site covers 2.3 acres.
Who is building it?
The applicant is Bridge Corporation Limited.
Has it been approved?
No. The application was lapsed on 13 Mar 2025, so it is no longer under consideration.
Where is it?
In Deora Saran, Tahrauli, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹93.6 crore; a site of 2.3 acres and 2.3 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 9 Mar 2025.
Project details
| Official title | Proposed Reserved Forest Land to be diverted for construction of Betwa River Bridge & Approach Road at Khiriya Ghat of Moth-Baghera Road, in District:- Jhansi |
|---|---|
| Status | Lapsed |
| Status since | 13 Mar 2025 |
| Application filed | 9 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bridge Corporation Limited |
| Land area | 2.3 acres (0.9 ha) |
| Forest land | 2.3 acres (0.9 ha) |
| Project cost | ₹93.6 crore |
| Village / locality | Deora Saran |
| Taluk / tehsil | Tahrauli |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07156 |
In context
12 applications in Jhansi since January 2022 are in the same category (Roads & highways): 1 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. At 2.3 acres, this one is smaller than 73% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Deora Saran, Tahrauli, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be diverted for construction of River Bridge — forest land use approved, 400 m away
- Sand/Morrum Mining From Betwa Riverbed — under environmental review, 2.9 km away
- Proposed River Bed Sand/ Morrum Mining from Betwa River Bed at Araji No. 321 ,… — under environmental review, 3.4 km away
- Proposed River Bed Sand/ Morrum Mining from Betwa River Bed at Araji No. 321 ,… — cleared for impact study, 3.4 km away
- Teharka Sand/Morrum Mining Project — environmental approval granted, 3.7 km away
- Teharka Sand/Morrum Mining Project — cleared for impact study, 3.7 km away
- Sand/Morrum Mining from Betwa River Bed Mining Project — cleared for impact study, 3.7 km away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Arazi… — environmental approval granted, 3.8 km away
More from Bridge Corporation Limited in Jhansi
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — in-principle approval, conditions pending
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — lapsed
- Proposed Forest Land to be diverted for construction of River Bridge — forest land use approved
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — in-principle approval, conditions pending
All 5 Bridge Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.