Quick answers
What is this project?
Building Stone (Granite), Khanda-Boulder/ Gitti-Ballast Mining Project is a proposed mining project in Bonda, Mauranipur, Jhansi, Uttar Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Shubhankar Budholiya.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 May 2026), as of 27 Nov 2026.
Where is it?
In Bonda, Mauranipur, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 4.9 acres.
When was it filed?
The application was filed on 24 Feb 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 May 2026 |
| Application filed | 24 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shubhankar Budholiya |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Bonda |
| Taluk / tehsil | Mauranipur |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04247 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is smaller than 66% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bonda, Mauranipur, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone or Khanda, Gitti, Boulder Mining Project — lapsed, 9.2 km away
- Sand/Morrum Mining From Sukhnai Riverbed — cleared for impact study, 11.4 km away
- Proposed "River Bed Sand/ Morrum Mining" from River bed of Sukhnai River at… — environmental approval granted, 11.4 km away
- Proposed "River Bed Sand/ Morrum Mining" from River bed of Sukhnai River at… — cleared for impact study, 11.4 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 13.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 13.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 15.7 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 16.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.