What is Sand/Morrum Mining from Betwa River Bed mining project?
Sand/Morrum Mining from Betwa River Bed mining project is a proposed mining project in Parechha, Moth, Jhansi, Uttar Pradesh. The site covers 22 acres.
Who is building it?
The applicant is Jagdish Prasad Sahu.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Parechha, Moth, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2.3 crore and a site of 22 acres.
When was it filed?
The application was filed on 31 Mar 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 23 Oct 2026 |
| Application filed | 31 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Jagdish Prasad Sahu |
| Land area | 22 acres (8.9 ha) |
| Project cost | ₹2.3 crore |
| Village / locality | Parechha |
| Taluk / tehsil | Moth |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04320 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 22 acres, this one is larger than 73% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Parechha, Moth, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Up Defence Industrial Corridor" — lapsed, 3.1 km away
- "Up Defence Industrial Corridor" — environmental approval granted, 3.1 km away
- Proposed project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — cleared for impact study, 4.7 km away
- Proposed Forest Land to be diverted for Construction of Link Road — in-principle approval, conditions pending, 4.8 km away
- Proposed Forest Land to be diverted for Entry/Exit approach to IOCL Retail… — lapsed, 5.5 km away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — lapsed, 6.2 km away
- Building Stone or Granite, Khanda, Boulder (Gitty) Mining Project — cleared for impact study, 6.2 km away
- Mining project by M/s Buddh Singh Granite — environmental approval granted, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.