Quick answers
What is Mining project by M/s Buddh Singh Granite?
This approved mining project by M/s Buddh Singh Granite is in Marora Khurd, Moth, Jhansi, Uttar Pradesh. The site covers 2.2 acres.
Who is building it?
The applicant is Buddh Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Nov 2022), as of 27 Nov 2026.
Where is it?
In Marora Khurd, Moth, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹95 lakh and a site of 2.2 acres.
When was it filed?
The application was filed on 19 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Nov 2022 |
| Application filed | 19 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Buddh Singh |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Marora Khurd |
| Taluk / tehsil | Moth |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00159 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.2 acres, this one is smaller than 92% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Marora Khurd, Moth, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone or Granite, Khanda, Boulder (Gitty) Mining Project — cleared for impact study, 100 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — lapsed, 100 m away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — lapsed, 2.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — more information requested, 5.1 km away
- Proposed project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — cleared for impact study, 5.9 km away
- Sand/Morrum Mining from Betwa River Bed mining project — under environmental review, 6.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — forest land use approved, 6.5 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — lapsed, 6.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.