Quick answers
What is Building Stone or Khanda, Gitti, Boulder, Mining Project?
Building Stone or Khanda, Gitti, Boulder, Mining Project is a lapsed mining project in Marora Khurd, Moth, Jhansi, Uttar Pradesh. The site covers 2.6 acres.
Who is building it?
The applicant is Madhu Arora.
Has it been approved?
No. The application was lapsed on 15 Nov 2025, so it is no longer under consideration.
Where is it?
In Marora Khurd, Moth, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹80 lakh and a site of 2.6 acres.
When was it filed?
The application was filed on 22 Apr 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Nov 2025 |
| Application filed | 22 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Madhu Arora |
| Land area | 2.6 acres (1.1 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Marora Khurd |
| Taluk / tehsil | Moth |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02020 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.6 acres, this one is smaller than 88% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Marora Khurd, Moth, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Buddh Singh Granite — environmental approval granted, 100 m away
- Building Stone or Granite, Khanda, Boulder (Gitty) Mining Project — cleared for impact study, 200 m away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — lapsed, 2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — more information requested, 5 km away
- Proposed project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — cleared for impact study, 6 km away
- Sand/Morrum Mining from Betwa River Bed mining project — under environmental review, 6.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — forest land use approved, 6.4 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — lapsed, 7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.