Quick answers
What is "Up Defence Industrial Corridor"?
"Up Defence Industrial Corridor" is an approved industrial project in Erich, Garautha, Jhansi, Uttar Pradesh. The site covers 2,660.6 acres.
Who is building it?
The applicant is Uttar Pradesh Expressways Industrial Development Authority (Upeida).
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Jan 2024), as of 27 Nov 2026.
Where is it?
In Erich, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹474.9 crore and a site of 2,660.6 acres.
When was it filed?
The application was filed on 20 Nov 2023.
Project details
| Official title | "Up Defence Industrial Corridor" At Village – Erach, Gendakabula, Jhabra, Kathari, Naikera And Labhera Tehsil Garautha District Jhansi Uttar Pradesh By Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) |
|---|---|
| Status | Environmental approval granted |
| Status since | 18 Jan 2024 |
| Application filed | 20 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Uttar Pradesh Expressways Industrial Development Authority (Upeida) |
| Land area | 2,660.6 acres (1,076.7 ha) |
| Project cost | ₹474.9 crore |
| Village / locality | Erich |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00682 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Nov 2023 (this page) | Environmental approval granted | 2,660.6 acres | ₹474.9 crore |
| Early planning filed 27 Oct 2023 | Lapsed | 2,660.6 acres | ₹474.9 crore |
In context
5 applications in Jhansi since January 2022 are in the same category (Industry): 3 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Erich, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Up Defence Industrial Corridor" — lapsed, 0 m away
- Proposed Forest Land to be diverted for Construction of Link Road — in-principle approval, conditions pending, 1.8 km away
- Proposed Forest Land to be diverted for Entry/Exit approach to IOCL Retail… — lapsed, 2.4 km away
- Sand/Morrum Mining from Betwa River Bed mining project — under environmental review, 3.1 km away
- Proposed Diversion for Laying of Water Distribution Line along Gursarai-Erach… — more information requested, 3.9 km away
- Proposed project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — cleared for impact study, 4.1 km away
- Sand/Moram Mining Project at Betwa River Bed, Gata No. 2118, 2119, Khand No.… — lapsed, 5.2 km away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Arazi… — lapsed, 5.5 km away
More from Uttar Pradesh Expressways Industrial Development Authority (Upeida) in Jhansi
- Jhansi Link Expressway (From Bundelkhand Expressway to BIDA Connecting Jhansi… — more information requested
- Proposed Forest Land to be diverted for Construction of Link Road — in-principle approval, conditions pending
4 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects in Jhansi
All 39 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects across India