Quick answers
What is this project?
• Proposal for the Diversion of Road Side Protected Forest for Laying Water Supply Pipeline Under Multi Group of Village for Surface Water Supply Scheme Jal Jeevan Mission Firozabad Package-2 Laying Along Sirsaganj-Karhal Road (M.D.R.-126) From Chainage 6.800 Km to Chainage 8.824 Km is a lapsed pipeline project in Ludhauli, Shikohabad, Firozabad, Uttar Pradesh. The site covers 8.9 acres.
Who is building it?
The applicant is Executive Engineer.
Has it been approved?
No. The application was lapsed on 3 Nov 2026, so it is no longer under consideration.
Where is it?
In Ludhauli, Shikohabad, Firozabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1,313.2 crore; a site of 8.9 acres and 1,010 m² of forest land.
When was it filed?
The application was filed on 26 May 2026.
Project details
| Official title | • Proposal for the Diversion of Road Side Protected Forest for Laying Water Supply Pipeline Under Multi Group of Village for Surface Water Supply Scheme Jal Jeevan Mission Firozabad Package-2 Laying Along Sirsaganj-Karhal Road (M.D.R.-126) From Chainage 6.800 Km to Chainage 8.824 Km in District Firozabad in the State of Uttar Pradesh. |
|---|---|
| Status | Lapsed |
| Status since | 3 Nov 2026 |
| Application filed | 26 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Executive Engineer |
| Land area | 8.9 acres (3.6 ha) |
| Forest land | 1,010 m² |
| Project cost | ₹1,313.2 crore |
| Village / locality | Ludhauli |
| Taluk / tehsil | Shikohabad |
| District | Firozabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06710 |
In context
6 applications in Firozabad since January 2022 are in the same category (Pipelines): 0 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected.
Where it is
Ludhauli, Shikohabad, Firozabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land To Be Diverted For Laying Of Optical Fiber Cable By M/S… — lapsed, 6.7 km away
- LILO of one ckt of 765kV Agra (PG) – Fatehpur (PG) 2xS/c line at Ghiror — forest land use approved, 7.3 km away
- Amended BharatNet Project (Madanpur-Firozabad) — lapsed, 9.4 km away
- The Diversion of Road Side Protected Forest for Laying Water Supply Pipeline… — lapsed, 13.1 km away
- The Diversion of Road Side Protected Forest for Laying Water Supply Pipeline… — lapsed, 13.4 km away
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC) - Firozabad — under environmental review, 14.3 km away
- Diversion of 0.0110 Hectare of protected Forest land Under Social Forestry… — forest land use approved, 14.9 km away
- Amended BharatNet Project (Shikohabad-Firozabad) — lapsed, 15 km away
More from Executive Engineer in Firozabad
- Forest Clearance Regarding Non-Forestry Use of Roadside Protected Forest Land… — lapsed
- Forest Clearance Regarding Non-Forestry Use of 0.6409 Hectares of Roadside… — lapsed
- The Diversion of Road Side Protected Forest for Laying Water Supply Pipeline… — lapsed
- The Diversion of Road Side Protected Forest for Laying Water Supply Pipeline… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.